Changi Airport Skytrain

Last updated

Changi Airport Skytrain
Skytrain entering T2.JPG
Changi Airport SkyTrain Terminal 2 station
Overview
StatusOperational
OwnerChangi Airport Group
Locale Singapore
Stations7
Service
Type Automated guideway transit/People mover
Services5
Operator(s)Changi Airport Group
Depot(s)Terminal 1 (Public) & Terminal 3 (Airside)
Rolling stock Mitsubishi Crystal Mover (2006–present)
Adtranz C-100 (1990–2006)
History
Opened22 November 1990;32 years ago (1990-11-22)
Technical
Line length10.3 km (6.4 mi)
CharacterFully elevated
Track gauge 1,850 mm (6 ft 2732 in)
Guide rail span: 3.2 m (10 ft 6 in)
Electrification 750 V DC   third rail
Operating speed50 km/h (31 mph)
Signalling Kyosan APM fixed block ATC under ATO GoA 4 (UTO), with subsystems of ATP, ATS and CBI [1]
Route map

Contents

BSicon cBS.svg
Terminal 1
BSicon BSe.svg
BSicon BSe.svg
BSicon BSe.svg
BSicon cBS.svg
Station C
BSicon cBS.svg
BSicon KHSTa blue.svg
BSicon KHSTa blue.svg
BSicon cBS.svg
Station D
BSicon ABZg+l blue.svg
BSicon STRq blue.svg
BSicon ABZg+r blue.svg
Station B
BSicon cBS.svg
BSicon KHSTe blue.svg
BSicon KGRZ2.svg
BSicon KHSTe blue.svg
BSicon KGRZ3.svg
BSicon cBS.svg
Station E
BSicon cBS.svg
BSicon utCONTg@Gq.svg
BSicon utKBHFeq.svg
BSicon GRZ4m1.svg
BSicon cBS.svg
Terminal 3
BSicon cBS.svg
BSicon cBS.svg
Terminal 2
Station A
BSicon cBS.svg
BSicon KHSTa orange.svg
BSicon KHSTa orange.svg
BSicon cBS.svg
Station F
BSicon cBS.svg
BSicon ABZgl orange.svg
BSicon STRq orange.svg
BSicon STRr orange.svg
Station A
South
BSicon cBS.svg
BSicon KHSTe orange.svg
Legend
BSicon HSTq blue.svg
PMS North:
Public and transit
BSicon HSTq orange.svg
PMS South:
Transit only

The Changi Airport Skytrain is an automated people mover (APM) that connects Terminals 1, 2 and 3 at Singapore Changi Airport. Opened in 1990, it was the first driverless and automated system of its kind in South East Asia. [2] The Changi Airport Skytrain operates from 05:00 to 02:30 daily. [3] Traveling on the Skytrain is free and an inter-terminal journey takes approximately four minutes.

Since 2006, the trains operating on all Skytrain lines are Crystal Movers manufactured by Mitsubishi Heavy Industries. All stations are equipped with platform screen doors, are air-conditioned and have plasma displays indicating the arrival time of the next train.

With the opening of Changi Airport MRT station on 8 February 2002, the Skytrain is able to connect passengers at Terminal 1 to the MRT station entrances located at Terminals 2 and 3. [3]

History

In November 1990, alongside the opening of Changi Airport's second passenger terminal, the Skytrain began operations to connect the brand new Terminal 2 to the existing Terminal 1. It operated using the Adtranz C-100 [4] and the ride lasted approximately 60 seconds. [5]

On 17 March 2006, the rolling stock was replaced with the current Mitsubishi Crystal Mover System. Services were extended to the newly opened Terminal 3 and the South section opened in November 2007 with 5 new stations. [6]

On 24 February 2015, services between Station B and E (Terminal 2 to 3 and vice versa) were suspended to make way for the construction of Jewel Changi Airport. The service was reopened to transit passengers on 12 April 2019, upon the opening of Jewel Changi Airport using a 3-car service. It was then fully reopened for the public and transit passengers in July 2019. [7]

In April 2020, due to the COVID-19 pandemic drastically reducing passenger volumes, services from Station B to E (T2 to T3) and Station A to F (T2 to T3) were suspended for all passengers, as well as Station B to C (T3 to T1) and Station D to E (T1 to T2) services for transit passengers. All Skytrain services were then fully suspended on 1 May 2020.

On 27 July 2020, services from Station B to C (T3 to T1) were resumed for public passengers only.

On 17 November 2022, services from Station B to E (T3 to T2) were resumed for public passengers only.

System

The Skytrain system consists of two independent systems: an airside-only PMS/South, which provides services between Terminals 2 and 3 and between Terminal 3 main building and South Pier, and a PMS/North that provides services between Terminals 1, 2 and 3 on both the landside and airside. The system use a bypass shuttle for services between Terminals 2 and 3 and single-lane shuttles for the rest of the system, with both the landside and airside having their own lanes. [4]

The system consists of seven stations (A-South, A, B, C, D, E and F), each giving the name of the nearest boarding gate for easy recognition for passengers. [4]

The Main Operation Control Center is located inside the maintenance office near A-South Station and the Standby Satellite Control Center is located in the center of the Terminal 3 building. Either of the control centers can be used to control the entire system. [4]

Rolling stock

Adtranz C-100

Initially, the Skytrain rolling stock consisted of Adtranz C-100s, jointly built by Westinghouse and Adtranz (acquired by Bombardier). Although stations were designed to accommodate two-car trains, the C-100 trains operated in single units, without a second carriage per train, and the two innermost platform screen doors of each station were for emergency purposes (the trains stopped at the outer half of each station, with two doors on each half).

Mitsubishi Heavy Industries Crystal Mover

Mitsubishi Heavy Industries Crystal Mover
SIN Changi Airport Skytrain Set 17 & unknown @ Terminal 3 2023-10-14.jpg
Two skytrain cars coupled together departing Terminal 3
CrystalMover-Changi-Int.JPG
Interior of the Skytrain Crystal Mover on PMS/North; trains on PMS/South feature orange seats
In service17 March 2006;17 years ago (2006-03-17) – present
Manufacturer Mitsubishi Heavy Industries
Built at Mihara, Hiroshima
Family name Crystal Mover
Replaced Adtranz C-100
Constructed
  • 2002 – 2006
  • 2016 – 2019 (Expansion)
Entered service2006
Number built22 vehicles
Number in service22 vehicles
FormationSingle vehicles that can be coupled to form 2- or 3-car trains
Fleet numbers01 – 22
Capacity8 seated, 107 standing
Operator(s)Changi Airport Group
Depot(s)Terminal 1 & Terminal 3 (Airside trains only)
Line(s) servedAll Skytrain services
Specifications
Car body constructionWelded aluminium
Car length12.55 m (41 ft 2 in)
Width2.69 m (8 ft 10 in)
Height3,725 mm (12 ft 2.7 in)
Doors4 per car
Maximum speed
  • 60 km/h (37 mph) (design)
  • 50 km/h (31 mph) (service)
Weight15 t (15 long tons; 17 short tons) per car
Traction system Mitsubishi IGBTVVVF inverter vector control
Traction motors 2 × 80 kW (110 hp) 3-phase AC induction motor
Power output160 kW (210 hp)
Acceleration 1 m/s2 (3.3 ft/s2)
Deceleration
  • 1 m/s2 (3.3 ft/s2) (service)
  • 1.3 m/s2 (4.3 ft/s2) (emergency)
Electric system(s) 750 V DC   third rail
Current collector(s) Collector shoe
AAR wheel arrangement A-A
Braking system(s) Electric command pneumatic brake with regenerative brake with stand-by brake and parking brake (with variable load control and wheel slide prevention control)
Safety system(s)Kyosan APM fixed block ATC under ATO GoA 4 (UTO), with subsystems of ATP, ATS and CBI [1]
Coupling system Dellner
Track gauge 1,850 mm (6 ft 2732 in)
Guide rail span: 3.2 m (10 ft 6 in)
Notes/references
[4]

In 2002, work began on a new S$135 million Mitsubishi Crystal Mover-based system to accommodate the planned opening of Changi Airport Terminal 3 and the projected increase in demand as the airport expanded. [8] During the upgrade, the existing C-100 system continued operations on one of the tracks while the other was upgraded from December 2004 to 16 March 2006, after which the latter resumed operations while the former was closed for upgrading. [4] Full operations finally began in November 2007 when the lines serving Terminal 3 opened. [7]

Overview

Mitsubishi delivered 16 Crystal Mover vehicles to Singapore Changi Airport, ten of which are allocated to PMS/North and six to PMS/South. Five different designs with innovative external face images derived from the original Crystal Mover design were proposed to Changi Airport, with the final vehicle design being awarded the Good Design Award in 2006. [4]

The Crystal Mover was also designed for flexible response to a variety of operations, from a one car operation to multiple coupled-car operations, depending upon the system requirements; this is seen in the use of dual-car operations for PMS/North landside and PMS/South, single-car operations for PMS/North airside and triple-car operations for T2-T3 services on PMS/North. [4]

Exterior-wise, the Crystal Mover vehicles are painted in a base livery of silver and grey, blending in with the color scheme of the airport terminal buildings. However, many units are decorated with colorful promotional liveries. Trains come in two interior color schemes: blue for PMS/North trains, and orange for PMS/South trains. [7]

All Crystal Mover vehicles have four wide-opening doors, two on each side. The interior features longitudinal seating at both ends of the car for a total of 8 seats, with a spacious standing area in the middle of the car for baggage and trolleys. At the ends of every car, an equipment housing offers a flat platform for additional seating. Trains were also fitted with two LED text displays located near the ceiling which display travel information, and two media screens displaying Airport promotional material. [7]

Train formation

The configuration of a Crystal Mover in revenue service is just the one car. With both the motors and the third rail current collectors, the train cars can be coupled up to 2 or 3 cars during service.

Signalling and operations

In the Changi Airport Skytrain, the signaling system and the automatic operation system utilise a train detection system based on the check-in/check-out principle, an ATC and an overrun protection system (ORP) by on-board ATP. When a train enters the ORP signal aspect section, the on-board ATP device creates the ORP control pattern in a manner which protects the fixed-point stop control pattern by the on-board ATO. If the train speed overshoots the ORP control pattern, the emergency brake is activated, safely bringing the train to an emergency stop. [4]

The system also uses a by-pass operation between Terminals 2 and 3, where trains are placed under synchronous control so that they depart and arrive at each corresponding station at the same time. Specifically, the station departing times are synchronized by the count of the station dwell time which is automatically adjusted based on the stoppage state at the station. Also, the train speed is adjusted by ATO which recognizes signals which are sent from the way-side control devices to the on-board control device at the time of departure from a station so that the crossing times in the bypass section are optimized and their arrival times are synchronized. [4]

Redevelopment works

In 2015, one portion of the Changi Airport Skytrain system connecting Station B and E was suspended due to construction works for Jewel Changi Airport. Passengers in the public area had to use the mezzanine level bridge along Changi Airport MRT station, and the Skytrain operating between Station A and F in the airside. [6] Landside operations for services between stations A and F only resumed in July 2019.

Expansion

To increase the system capacity of the Skytrain, six new train cars have been purchased which subsequently entered service in 2019. The existing shuttle between Terminals 2 and 3 was upgraded to a three-car system, whereas the shuttle between Terminal 3 and 3 South was upgraded to a two-car system. [9]

Terminal 4, opened in 2017, is not served by the Skytrain. However, the future Terminal 5 will also have an underground automated people mover system. [10]

Related Research Articles

<span class="mw-page-title-main">Rail transport in Singapore</span> Overview of rail transport in Singapore

Rail transport in Singapore mainly consists of a passenger urban rail transit system spanning the entire city-state: a rapid transit system collectively known as the Mass Rapid Transit (MRT) system operated by the two biggest public transport operators SMRT Trains and SBS Transit, as well as several Light Rail Transit (LRT) rubber-tyred automated guideway transit lines also operated by both companies. In addition, local specialised light rail lines are in operation in places such as the Singapore Changi Airport and Sentosa.

<span class="mw-page-title-main">Innovia APM 100</span> Automated people mover manufactured by Bombardier

The Innovia APM 100 is an automated people mover (APM) rolling stock first developed by Westinghouse, intended mainly for airport connections and light rail in towns. They are operated by Automatic Train Control (ATC), making it fully automatic and driverless.

<span class="mw-page-title-main">Crystal Mover</span> Rubber-tired automated people mover system manufactured by Mitsubishi Heavy Industries

The Crystal Mover is a rubber-tired automated people mover (APM) system for airport and public transport applications manufactured at Mitsubishi Heavy Industries (MHI) Mihara Machinery Works in Mihara, Japan. The Crystal Mover, initially based on the Japanese APM standard, is used in automated guideway transit (AGT) systems in China, Japan, Singapore, South Korea, the United Arab Emirates and the United States.

<span class="mw-page-title-main">Hong Kong International Airport Automated People Mover</span>

The Hong Kong International Airport Automated People Mover is a driverless people mover located within Hong Kong International Airport. It operates in two segments within Terminal 1 and the Midfield Concourse, and between Terminals 1, Terminals 2, and also connects to the Skypier.

<span class="mw-page-title-main">DFW Skylink</span> Automated people mover at Dallas/Fort Worth International Airport

Skylink is an automated people mover (APM) operating at Dallas/Fort Worth International Airport (DFW). It is an application of the Innovia APM 200 system, and is maintained and operated by Alstom. When it opened in 2005, it was the world's longest airside airport train system.

<span class="mw-page-title-main">Aerotrain (KLIA)</span>

The Aerotrain is an automated people mover system located within the Kuala Lumpur International Airport in Malaysia.

<span class="mw-page-title-main">The Plane Train</span> Airside people mover at Hartsfield–Jackson Atlanta International Airport

The Plane Train is a 24/7 automated people mover (APM) located at Hartsfield–Jackson Atlanta International Airport. Made by Westinghouse Electric Corporation and maintained by Bombardier, it transports passengers between the terminals and the airside concourses. The system is the world's most heavily traveled airport APM, with 64 million riders as of 2002.

<span class="mw-page-title-main">Pittsburgh International Airport People Movers</span>

The Pittsburgh International Airport People Mover is a fully automated people mover system at the Pittsburgh International Airport serving Pittsburgh, Pennsylvania.

<span class="mw-page-title-main">Stansted Airport Transit System</span> Automated people mover at London Stansted Airport

The Stansted Airport Track Transit System (TTS) is a fully automated people mover system which operates within London Stansted Airport in the United Kingdom.

<span class="mw-page-title-main">MIA Mover</span>

The MIA Mover is an automated people mover (APM) system which opened at the Miami International Airport (MIA) in metropolitan Miami, Florida, United States on September 9, 2011. The MIA Mover is designed to quickly transport landside passengers between Miami International Airport's Main Terminal and the Miami Intermodal Center (MIC). The MIA Mover is one of three separate automated people movers operating at the airport. The others are the Skytrain, which operates within Concourse D, and the MIA e Train people mover connecting Concourse E's satellite building.

<span class="mw-page-title-main">Skytrain (Miami International Airport)</span> People mover at Miami International Airport, United States

The Skytrain is a people mover at Miami International Airport (MIA) in Miami-Dade County, Florida, United States. One of three people movers at MIA, it operates within Concourse D and connects four stations over a distance of 0.70 miles (1.12 km). It uses Crystal Mover trains, which are fully-automated and travel along the roof of the terminal. The route has transported up to 40,000 passengers daily.

<span class="mw-page-title-main">Infrastructure of Changi Airport</span> Air and passenger facilities at Singapore Changi Airport

Singapore Changi Airport is Singapore's primary international airport and a major aviation hub in the Asia-Pacific region. It is one of the commercial airports in Singapore, the other being the Seletar Airport. Since the rankings for the World's Best Airport by Skytrax began in 1999, the airport was classified as the world's best on multiple occasions, including for eight consecutive years from 2013 to 2021

<span class="mw-page-title-main">Mitsubishi Heavy Industries Crystal Mover C810</span> Class of electric multiple units in Singapore

The Mitsubishi Heavy Industries Crystal Mover C810 is an automated people mover train that serves the Sengkang LRT line and Punggol LRT line in Singapore. The trains have been operating since 18 January 2003, with its first service on the Sengkang East Loop.

<span class="mw-page-title-main">Soekarno–Hatta International Airport Terminal 3</span> International terminal in Banten, Indonesia

Soekarno–Hatta International Airport Terminal 3 is an international terminal of Soekarno–Hatta International Airport serving Greater Jakarta, Indonesia. It is located on northeast side of the airport. Terminal 3 has a different style than other terminals of the airport. Terminal 1 and 2 were built with incorporation of the local architecture into the design, but Terminal 3 is built in contemporary modern design with environmental friendly and traditional sense. The terminal was first named as Terminal 3 Ultimate but later it was decided to integrate with the old Terminal 3.

<span class="mw-page-title-main">Orlando International Airport People Movers</span> Automated transit system

The Orlando International Airport People Movers are a set of automated people mover (APM) systems operating within Orlando International Airport. The four original people mover systems connect the airport's main terminal to four satellite airside concourses. A fifth AGT people mover system was installed in 2017 to connect the main terminal with the airport's new Intermodal Terminal.

<span class="mw-page-title-main">Tampa International Airport People Movers</span>

The Tampa International Airport People Movers are a set of automated people mover systems operating within Tampa International Airport. The primary set of people movers are automated guideway transit (AGT) systems that connect the airport's main terminal to four satellite airside concourses. Opened in 1971, the landside/airside shuttles were the first people movers used to transport passengers within an airport terminal and it is today Bombardier Transportation's longest running people mover system. A fifth people mover line known as SkyConnect, which began operating in 2018, connects the main terminal with the airport's economy parking garage and rental car center. In addition, a monorail once connected the main terminal and the long-term parking garage from 1991 until its closure in 2020.

<span class="mw-page-title-main">MIA e Train</span>

The MIA e Train is one of three automated people mover systems operating at Miami International Airport. The MIA e Train connects the satellite building of Concourse E with the rest of Concourse E which is connected to the main terminal. The system opened in 2016 replacing an earlier system and was built at a cost of $87 million.

<span class="mw-page-title-main">Gatwick Airport Shuttle Transit</span> Automated people mover linking terminals at Gatwick Airport

The Gatwick Airport Shuttle Transit is a 0.75-mile (1.21 km) long elevated automated people mover that links the North and South Terminals at London's Gatwick Airport. The line is ground-side, and besides linking the two terminals also serves to link the North terminal to the airport railway station. Although sometimes colloquially, but erroneously, known as a "monorail", the transit vehicles are carried on rubber tyres running on a concrete track with twin running surfaces and are steered by separate guide rails.

<span class="mw-page-title-main">Heathrow Terminal 5 Transit</span> Automated people mover at London Heathrow Airport

The Heathrow Terminal 5 Transit is an automated people mover system (APM) at London Heathrow Airport in the United Kingdom. It operates in the Heathrow Terminal 5 complex and conveys air passengers between the main airport terminal and its satellite buildings.

<span class="mw-page-title-main">Shanghai Pudong Airport APM</span> Rapid transit system in Pudong International Airport, China

Shanghai Pudong Airport APM is an automated people mover in the Pudong International Airport. In the initial phase, there are two lines, each connecting a terminal building and a satellite hall. The two lines are planned to be connected after the completion of Terminal 3 in the future. The system uses Type A metro trains, currently in a 4-car configuration, with conditions reserved for a 5-car configuration across the fleet.

References

  1. 1 2 "Kyosan Corporate Report 2018". Archived from the original on 16 June 2020. Retrieved 16 June 2020.
  2. "Singapore Changi Airport I, II, III". CPG Corporation. Archived from the original on 29 September 2007.
  3. 1 2 "Transfer Between Terminals". changiairport.com. Archived from the original on 8 May 2017. Retrieved 16 April 2017.
  4. 1 2 3 4 5 6 7 8 9 10 "Automated People Mover "Crystal Mover" for Singapore Changi International Airport" (PDF). Mitsubishi Heavy Industries. Archived (PDF) from the original on 19 August 2021. Retrieved 22 November 2019.
  5. Erlanger, Steven; Times, Special To the New York (7 December 1990). "Singapore Journal; For Hub of the East, a Mere Airport Wouldn't Do". The New York Times. ISSN   0362-4331. Archived from the original on 18 August 2021. Retrieved 23 September 2021.
  6. 1 2 "Getting between Terminal 2 & Terminal 3". Archived from the original on 1 April 2015. Retrieved 6 April 2015.
  7. 1 2 3 4 "Changi Airport Skytrain". Land Transport Guru. 29 February 2016. Archived from the original on 1 October 2020. Retrieved 22 November 2019.
  8. "Milestones of Changi Airport". Changi Airport. Archived from the original on 3 January 2007.
  9. "Skytrain at Changi Airport to get systems upgrade, more cabins". The Straits Times. 3 May 2016. Archived from the original on 4 September 2016. Retrieved 3 May 2016.
  10. "Decades of groundwork for T5 to take flight". The Straits Times. 3 December 2017. Archived from the original on 11 November 2020. Retrieved 8 April 2019.