USS Tullibee (SSN-597)

Last updated
USS Tullibee (SSN-597).jpg
USS Tullibee (This photo was probably taken shortly after her commissioning in 1960. The distinctive shark-fin domes are for the PUFFS sonar system).
History
Flag of the United States.svgUnited States
NameUSS Tullibee
Awarded15 November 1957
Laid down26 May 1958
Launched27 April 1960
Commissioned9 November 1960
Decommissioned25 June 1988
Stricken25 June 1988
Motto
  • Venator-Necator
  • (Latin: "Hunter-Killer")
FateEntered Ship-Submarine Recycling Program, 5 January 1995
General characteristics
Type Nuclear submarine
Displacement
  • 2,316 long tons (2,353 t) surfaced
  • 2,607 long tons (2,649 t) submerged
Length273 ft (83 m)
Beam23 ft 7 in (7.19 m)
Draft21 ft (6.4 m)
Propulsion S2C reactor, turbo-electric, 2,500 hp (1,900 kW)
Speed
  • 13 knots (24 km/h; 15 mph) surfaced
  • 14.8 knots (27.4 km/h; 17.0 mph) submerged
Complement6 officers and 60 enlisted
Armament4 × 21 in (533 mm) torpedo tubes

USS Tullibee (SSN-597), a unique submarine, was the second ship of the United States Navy to be named for the tullibee, any of several whitefishes of central and northern North America.

Contents

At 273 feet long and 2,640 tons displacement, USS Tullibee was the smallest nuclear-powered attack submarine in the US submarine fleet, although she was originally designed mainly for the anti-submarine (ASW) 'hunter-killer' role and was redesignated an attack submarine when the two roles were merged. The initial manning complement was 7 officers and 60 enlisted men. However before inactivation, the crew included 13 officers and over 100 enlisted men.

During her career, Tullibee achieved much and conducted many submarine firsts. During her commissioned service she submerged and surfaced 730 times and traveled approximately 325,000 nautical miles (602,000 km; 374,000 mi) equal to the distance from the Earth to the Moon and halfway back.

Construction

Tullibee was the result of Project Nobska, a study ordered in 1956 by Admiral Arleigh Burke, then Chief of Naval Operations, from the Committee on Undersea Warfare of the National Academy of Sciences. That report emphasized the need for deeper-diving, ultraquiet submarine designs using long-range sonar to accomplish the anti-submarine (ASW) 'hunter-killer' mission. [1] Tullibee incorporated three design innovations inspired by Project Nobska. First, it incorporated the first bow-mounted spherical sonar array. This required the second innovation: angled torpedo tubes amidships. Thirdly, Tullibee was propelled by a very quiet turbo-electric transmission powered by a S2C reactor and producing 2,500 shp (~1,900 kW). [2] [3]

The contract to build Tullibee was awarded to the Electric Boat Division of the General Dynamics Corporation on 15 November 1957. Her keel was laid down in Groton, Connecticut, on 26 May 1958. She was launched on 27 April 1960, sponsored by Mrs. John F. Davidson, the widow of Commander Charles F. Brindupke, CO of USS Tullibee (SS-284) when it was lost on 26 March 1944, and commissioned on 9 November 1960, with Commander Richard E. Jortberg in command. [4]

While Tullibee was very successful from a technology perspective, she was not repeated on cost-effective grounds. Tullibee's unexpected high cost of construction coupled with her intentionally inferior overall performance compared with the contemporary Thresher attack submarine convinced the Navy to abandon the specialized hunter-killer submarine concept and assign the hunter-killer role to the attack submarines. [5] The Navy then attempted to scale up the Tullibee engineering plant to make it suitable for a full-sized attack submarine, but the result - the Glenard P. Lipscomb - was also judged to be not completely successful and was not repeated. [6]

Operational history

1961–1968

Following her shakedown in January 1961, Tullibee engaged in sonar evaluations and nuclear submarine tactical exercises with Submarine Developmental Group 2, operating out of Naval Submarine Base New London, Connecticut, into 1963. During this period, the ship visited Bermuda on several occasions, as well as San Juan, Puerto Rico.[ citation needed ]

In July 1964, Tullibee participated in fleet exercises in anti-submarine warfare (ASW) tactics with NATO units. The submarine resumed developmental work in 1965 and operated in this capacity into the autumn of that year. On 28 October her home port was temporarily changed to Portsmouth, New Hampshire, when the ship entered the Portsmouth Naval Shipyard in Kittery, Maine, for an extensive overhaul. She remained in drydock for 754 days (2 years and 24 days), emerging on 2 January 1968.[ citation needed ]

1969–1979

Shifted back to New London, Tullibee deployed to the Caribbean Sea in January 1969 following refresher training and continued developmental work during 1969 and 1970. On 1 August 1970, Tullibee departed New London, bound for the Mediterranean and the ship's first service with the Sixth Fleet. During this period, she took part in NATO and Sixth Fleet exercises and made port visits to Athens, Greece; Naples, Italy; and Rota, Spain, before returning to New London on 14 December, having traveled some 20,000 miles (30,000 km) in 135 days.[ citation needed ]

In early 1971, the submarine returned to developmental exercises once more to work on SSN tactics and also made a port visit to Cape Canaveral, Florida. Participating in a major NATO exercise in the western Atlantic, Tullibee visited Halifax, Nova Scotia, before she received the Meritorious Unit Commendation for her contingency operations in the Mediterranean Sea during the previous year (from 9 September to 31 October 1970). For the remainder of the year 1971, Tullibee operated in the western Atlantic on NATO and ASW exercises. During this period, too, Tullibee received the Arleigh Burke Fleet Trophy for significant improvement in the ship's battle efficiency and readiness for that fiscal year.[ citation needed ]

The submarine conducted regular operations with the Atlantic Fleet Submarine Force into 1974, operating off the east coast and in the Caribbean Sea. Following one Caribbean cruise in the fall of 1974, Tullibee departed New London on 28 April 1975 for her second deployment to the Sixth Fleet. After operating in the Mediterranean into the fall of that year, the submarine returned to New London in October for an extended period of upkeep.[ citation needed ]

Tullibee subsequently participated in sonar evaluation tests with British destroyer HMS Matapan (D43) in the Caribbean Sea in two separate deployments between April and June 1976, before undergoing another extended upkeep period. The submarine conducted ASW operations and local operations into the fall of 1976. In October 1976, the ship received the "Golden Anchor" Award from the Commander in Chief, U. S. Atlantic Fleet (CINCLANTFLT), for meritorious retention. She departed New London on 12 November for her third Mediterranean deployment attached to the SIXTH Fleet. Tullibee conducted several significant SIXTH Fleet operations and participated in key NATO exercises. Her excellence in the area of anti-submarine warfare during this patrol was acknowledged by the Commander U.S. SIXTH Fleet of the prestigious "HOOK 'EM" Award for ASW Excellence in the spring of 1977. She returned to her home port on 24 April 1977 and during the remainder of the year, Tullibee underwent three upkeep periods interspersed with ASW exercises off the east coast of the United States. The early months of 1978 were spent in preparation for her fourth Mediterranean deployment. Departing New London in March, the submarine conducted operations with various units of the Sixth Fleet. The deployment was marred somewhat by a propulsion casualty which necessitated a two-month repair period spent at Rota, Spain. Tullibee returned to New London on 30 August. Operations out of that port took Tullibee into 1979.[ citation needed ]

1979–1987

On 24 July 1979, Commander Daniel J. Koczur relieved as the eighth Commanding Officer. During August 1979, Tullibee entered Portsmouth Naval Shipyard for its third and final major overhaul. This overhaul lasted until October 1982 (a total of 39 months). After leaving the shipyard, the remaining months of 1982 were spent conducting various operations, which provided refresher training for the crew.[ citation needed ]

On 26 April 1983, Commander David W. Candler relieved as the ninth Commanding Officer. On two occasions between April 1983 and February 1984 difficulties with the propulsion system required the ship to return to New London for repairs. In November 1985, the ship departed New London for her fifth and final extended deployment to the Mediterranean Sea. While deployed she conducted several ASW operations for Commander Sixth Fleet and participated in a major NATO ASW exercise. Tullibee's assignment to the Sixth Fleet during freedom of navigation exercises, involving combat with Libyan forces, resulted in her crew receiving a Navy Expeditionary Medal as well as her first award of a Navy Unit Commendation. The ship returned to New London, Connecticut, in April 1986 after having spent five months deployed.[ citation needed ]

On November 1986, Commander Charles R. Skolds relieved as the tenth Commanding Officer. The ship remained pier side in New London for the rest of 1986 and most of 1987 while preparing for inactivation. In September 1987 the ship was towed to Portsmouth Naval Shipyard to begin a ten-month inactivation and decommissioning.[ citation needed ]

Final disposition

Decommissioned and stricken from the Naval Vessel Register on 25 June 1988, ex-Tullibee entered the Navy's Nuclear Powered Ship and Submarine Recycling Program on 5 January 1995. Recycling was completed on 1 April 1996. One of the fairwater planes from the Tullibee can be seen as part of a permanent art installation at Magnuson Park on the shore of Lake Washington in Seattle. [7]

Awards

[ citation needed ]

See also

Other submarines with features first seen in Tullibee

Related Research Articles

USS <i>Glenard P. Lipscomb</i> Unique nuclear attack submarine

USS Glenard P. Lipscomb (SSN-685) was a unique nuclear-powered attack submarine of the United States Navy.

USS <i>Seawolf</i> (SSN-575) US Navy nuclear attack submarine

USS Seawolf (SSN-575) was the third ship of the United States Navy to be named for the seawolf, the second nuclear submarine, and the only US submarine built with a liquid metal cooled (sodium), beryllium-moderated nuclear reactor, the S2G. Her overall design was a variant of Nautilus, but with numerous detail changes, such as a conning tower, stepped sail, and the BQR-4 passive sonar mounted in the top portion of the bow instead of further below. This sonar arrangement resulted in an unusual bow shape above the water for a U.S. submarine. Originally laid down in 1953, her distinctive reactor was later replaced with a standard pressurized water reactor, the replacement process lasting from 12 December 1958 to 30 September 1960.

USS <i>Skate</i> (SSN-578) Submarine of the United States

USS Skate (SSN-578) was the third submarine of the United States Navy named for the skate, a type of ray, was the lead ship of the Skate class of nuclear submarines. She was the third nuclear submarine commissioned, the first to make a completely submerged trans-Atlantic crossing, the second submarine to reach the North Pole, and the first to surface there.

USS <i>Nautilus</i> (SSN-571) First nuclear-powered submarine of the US Navy, in service from 1954 to 1980

USS Nautilus (SSN-571) was the world's first operational nuclear-powered submarine and the first submarine to complete a submerged transit of the North Pole on 3 August 1958. Her initial commanding officer was Eugene "Dennis" Wilkinson, a widely respected naval officer who set the stage for many of the protocols of today's Nuclear Navy of the US, and who had a storied career during military service and afterwards.

USS <i>Baton Rouge</i> Los Angeles-class nuclear-powered attack submarine of the US Navy

USS Baton Rouge (SSN-689) was a Los Angeles-class nuclear-powered attack submarine which served with the United States Navy. With her keel laid down on 18 November 1972, Baton Rouge was launched on 26 April 1975. She became the second Los Angeles-class submarine to be commissioned, on 25 June 1977. In 1995, she was the first of her class to be decommissioned, after a collision with a Russian Sierra-class submarine.

USS <i>Darter</i> (SS-576) Submarine of the United States

USS Darter (SS-576), a unique submarine based on the Tang class, but incorporating many improvements, was the second ship of the United States Navy to be named for the darter, a type of small American fresh-water fish.

USS <i>Moosbrugger</i> Spruance-class destroyer

USS Moosbrugger (DD-980) was a Spruance-class destroyer built for the United States Navy by the Ingalls Shipbuilding Division of Litton Industries at Pascagoula, Mississippi. Affectionately nicknamed the "Moose" by her crews, she was named in honor of Vice Admiral Frederick Moosbrugger who is best known for his service in World War II as a highly successful commander of destroyer squadrons.

USS <i>Skipjack</i> (SSN-585) Submarine of the United States

USS Skipjack (SSN-585), the lead ship of her class of nuclear-powered attack submarine, was the third ship of the United States Navy to be named after the skipjack tuna.

USS <i>Shark</i> (SSN-591) Submarine of the United States

USS Shark (SSN-591), a Skipjack-class submarine, was the seventh ship of the United States Navy to be named for the shark.

USS <i>Plunger</i> (SSN-595) Submarine of the United States

USS Plunger (SSN-595), a Permit-class submarine, was the third ship of the United States Navy to be named "plunger", meaning a diver or a daring gambler.

USS <i>Haddo</i> (SSN-604) Submarine of the United States

USS Haddo (SSN-604), a Permit-class submarine, was the second ship of the United States Navy to be named for the haddo, a pink salmon fish prevalent on the Pacific coast of the United States and Canada.

USS <i>Phoenix</i> (SSN-702) Los Angeles-class nuclear-powered attack submarine of the US Navy

USS Phoenix (SSN-702), a Los Angeles-class submarine, was the fifth ship of the United States Navy to be named "Phoenix" and the third to be named after the city, Phoenix, Arizona. The contract to build her was awarded to the Electric Boat Division of General Dynamics Corporation in Groton, Connecticut, on 31 October 1973, and her keel was laid down on 30 July 1977. She was launched on 8 December 1979, sponsored by Mrs. Betty Harvey Rhodes, wife of Congressman John J. Rhodes, and commissioned on 19 December 1981.

USS <i>Whale</i> (SSN-638) Submarine of the United States

USS Whale (SSN-638) was a Sturgeon-class submarine nuclear-powered attack submarine of the United States Navy. She was the second ship of that name, after the whale family of aquatic mammals.

USS <i>Sturgeon</i> (SSN-637) Sturgeon class submarine

USS Sturgeon (SSN-637), was the lead ship of her class of nuclear-powered attack submarines. She was the third ship of the United States Navy to be named for the sturgeon.

USS <i>Bergall</i> (SSN-667) Submarine of the United States

USS Bergall (SSN-667), a Sturgeon-class attack submarine, was the second ship of the United States Navy to be named for the bergall, a small fish found along the Atlantic coast of North America from the Chesapeake Bay to Labrador.

USS <i>Lapon</i> (SSN-661) Submarine of the United States

USS Lapon (SSN-661), a Sturgeon-class attack submarine, was the second ship of the United States Navy to be named for the lapon, a scorpionfish of the Pacific coast of North America.

USS <i>Grenadier</i> (SS-525) Submarine of the United States

USS Grenadier (SS-525), a Tench-class submarine, was the second ship of the United States Navy to be named for the grenadier, a soft-finned deep sea fish of the Macrouridae with a long, tapering body and short, pointed tail family, also known as rattails.

USS <i>Sea Leopard</i> Submarine of the United States

USS Sea Leopard (SS-483), a Tench-class submarine, was the only ship of the United States Navy to be named for the leopard seal. Her keel was laid down by the Portsmouth Navy Yard on 7 November 1944. She was launched on 2 March 1945 sponsored by Hon. Margaret Chase Smith, United States Congresswoman from Maine, and commissioned on 11 June 1945.

USS <i>Key West</i> (SSN-722) Los Angeles-class nuclear-powered attack submarine of the US Navy

USS Key West (SSN-722), a Los Angeles-class submarine, is the third ship of the United States Navy to be named after Key West, Florida.

USS <i>McCloy</i>

USS McCloy (FF-1038) was the second and final Bronstein-class frigate. Commissioned as a destroyer escort, McCloy was redesignated as frigate on 30 June 1975. Decommissioned on 14 December 1990, and stricken from the Navy list on 4 October 1991, McCloy was transferred to Mexico on 12 November 1993, where she was recommissioned as Nicolas Bravo. Named for LCDR John C. McCloy, recipient of two Medals of Honor.

References

Notes

  1. Friedman, Submarines pp. 110-112
  2. Friedman, Submarines pp. 134-136, 243
  3. "US Navy Propulsion Systems".
  4. "Tullibee II (SSN-597)". Naval History and Heritage Command. U.S. Navy. Retrieved 12 November 2022. The second Tullibee (SSN-597) was laid down on 26 May 1958 at Groton, Conn., by the Electric Boat Div. of the General Dynamics Corp.; launched on 27 April 1960; sponsored by Mrs. John F. Davidson, the widow of Comdr. Charles F. Brindupke; and commissioned on 9 November 1960.
  5. Friedman, Submarines pp. 136
  6. Friedman, Submarines pp. 147-149
  7. "The Fin Project: From Swords into Plowshares, a sculpture by John T. Young". University of Washington . 1 September 2002. Retrieved 21 June 2020.

Sources

This article incorporates text from the public domain Dictionary of American Naval Fighting Ships .The entry can be found here.

This article incorporates text from the public domain Dictionary of American Naval Fighting Ships .The entry can be found here.