Wildcat Branch

Last updated
Wildcat Branch
Wildcat branch backbay.jpg
The Wildcat Branch on a c.2007 MBTA map at Back Bay
Route map

Contents

BSicon d-CONT2.svg
BSicon STRc3.svg
BSicon STRc1.svg
BSicon ABZ4+2f.svg
BSicon STRc3.svg
Wilmington Junction
BSicon STRc1.svg
BSicon STR.svg
BSicon CONT4.svg
BSicon eHST.svg
Salem Street (closed)
BSicon CONT2.svg
BSicon STRc3.svg
BSicon STR.svg
BSicon STRc1.svg
BSicon lv-ACC@F.svg
BSicon ABZ2+4g.svg
BSicon STRc3.svg
Wilmington
BSicon STRc1.svg
BSicon dCONT4-.svg
Wilmington Junction detail
BSicon v-CONTg.svg
BSicon exlCONTg@Gq.svg
BSicon exABZq2.svg
BSicon v-STR.svg
BSicon exlvBHF-.svg
BSicon exSTRc3.svg
BSicon exSTRq.svg
BSicon exCONTfq.svg
Wilmington Junction
Salem & Lowell Branch
BSicon exSTRc1.svg
BSicon v-SHI2gr.svg
BSicon exvSTR+4-.svg
BSicon v-STR2.svg
BSicon xvSTR.svg
BSicon STRc3.svg
BSicon STRc1.svg
BSicon xSPLe.svg
BSicon CONT4.svg
Haverhill Line
to North Station
BSicon LSTR.svg

The Wildcat Branch is a single track railroad branch line which connects the MBTA Lowell Line in Wilmington, Massachusetts to the MBTA Haverhill Line at Wilmington Junction. The total length of the branch line from the connection with the Lowell Line to the merge with the Haverhill Line is 2.88 miles (4.63 km). It was operated from 1836 to 1848, then rebuilt in 1874, and has been used since.

The branch's name is in reference to Wilmington's high school mascot, the Wildcats. The entire length of the current branch line is within the town of Wilmington.

History

The Wildcat Branch splits from the Lowell line just north of the outbound Wilmington platform. Wilmington Junction.jpg
The Wildcat Branch splits from the Lowell line just north of the outbound Wilmington platform.

Original line

The Boston and Lowell Railroad was chartered on June 5, 1830, and opened between its namesake cities on June 24, 1835. On March 15, 1833, while the B&L was under construction, the Andover and Wilmington Railroad was incorporated to build a branch line from Wilmington to Andover. [1] The A&W opened on August 8, 1836; it became the Andover & Haverhill Railroad which was quickly merged into the nascent Boston and Maine Railroad. [2] By 1843 the B&M ran from Wilmington to Portland, Maine; however, it was still dependent on the B&L to reach Boston. The B&M opened a new route (the Western Route) from Wilmington Junction (three miles north of Wilmington) to Boston via Reading in July 1845, thus negating the need for the original line between Wilmington and Wilmington Junction. The B&L operated the line for three years; its abandonment in 1848 was the first railroad abandonment in New England. [1] [3]

Rebuilt line

In 1874, the B&L rebuilt the line; some sections are on the original grade, while others are slightly west. Rather than connecting to the B&M mainline, this Wilmington Branch paralleled the Western Route to a new Wilmington Junction station at the junction with the Salem and Lowell Branch. This gave the B&L a route to Lowell via the S&L and the Lowell and Lawrence Railroad. [1] The B&L was merged into the B&M at the end of the 19th century. Passenger service on the S&L was abandoned west of Wilmington Junction in 1924 and east of it in 1932, but the branch was used to run some service to Haverhill and beyond as it avoided slow grade crossings in Malden and Wakefield. It still connects to the Western Route at Wilmington Junction and runs parallel to it for half a mile.

Cutbacks

Salem Street station (viewed here in 2014) was only open from 1959 to 1967. It was the only passenger station ever used on the Wildcat Branch. Salem Street station, September 2014.JPG
Salem Street station (viewed here in 2014) was only open from 1959 to 1967. It was the only passenger station ever used on the Wildcat Branch.

On June 14, 1959, the B&M introduced a series of service cutbacks, including the abandonment of the north half of the Woburn Loop. The Western Route was abandoned from Reading to Wilmington Junction; all service to Haverhill and beyond was rerouted via the Wilmington Branch. North Wilmington on the Western Route was replaced with Salem Street station, the first station ever built on the Wilmington Branch. [2] When the newly formed MBTA began funding B&M commuter service in January 1965, state subsidies were provided only for service to Reading on the Western Route and Wilmington on the Lowell Line; local governments were required to fund out-of-district service. Salem Street was closed on June 30, 1967, as the B&M cut all service on the line except for a single round trip to Haverhill. [4] That single trip was cut in June 1976. [4]

Modern service

The MBTA bought the B&M commuter rail assets, including the Wildcat Branch, on December 27, 1976. [4] The Reading line was re-extended to Haverhill as the Haverhill/Reading Line on December 17, 1979. Most trains on the line use the Western Route via Reading; however, the line south of Reading is single-tracked in many locations due to the 1970s construction of the Haymarket North Extension of the MBTA Orange Line subway and has numerous grade crossings, so some express trips run via the Wildcat and the lower Lowell Line. [4] Amtrak Downeaster service to Maine began on December 14, 2001; all Downeaster service uses the Wildcat except during service disruptions such as construction. [4]

Regular MBTA service via the Wildcat Branch ran until December 2020 and resumed in April 2021. [5] [6] [7] [8] From September 9 to November 5, 2023, all outer Haverhill Line service was routed over the Wildcat Branch during signal work on the inner part of the Haverhill Line. [9] Beginning May 20, 2024, weekday midday inbound trains were again temporarily routed over the Wildcat Branch during construction work. [10] [11]

The line also carries some freight service by CSX Transportation (formerly Pan Am Railways), primarily the train "DOBO" (Dover, New Hampshire, to Boston), which mainly hauls sand and gravel from the New Hampshire Northcoast railroad to the Boston Sand and Gravel facility in Somerville.[ citation needed ]

Related Research Articles

<span class="mw-page-title-main">Boston and Maine Railroad</span> Former railroad in New England

The Boston and Maine Railroad was a U.S. Class I railroad in northern New England. Originally chartered in 1835, it became part of what was the Pan Am Railways network in 1983.

<span class="mw-page-title-main">North Station</span> Train station in Boston, Massachusetts, US

North Station is a commuter rail and intercity rail terminal station in Boston, Massachusetts. It is served by four MBTA Commuter Rail lines – the Fitchburg Line, Haverhill Line, Lowell Line, and Newburyport/Rockport Line – and the Amtrak Downeaster intercity service. The concourse is located under the TD Garden arena, with the platforms extending north towards drawbridges over the Charles River. The eponymous subway station, served by the Green Line and Orange Line, is connected to the concourse with an underground passageway.

<span class="mw-page-title-main">Anderson Regional Transportation Center</span> Transit station in Woburn, Massachusetts, US

Anderson Regional Transportation Center (RTC) (noted on MBTA schedules and maps as Anderson/Woburn, and on Amtrak schedules and maps as Woburn–Anderson) is a train and bus station located at 100 Atlantic Avenue, off Commerce Way, in Woburn, Massachusetts, a suburb of Boston. It can be accessed from Exit 30 off Interstate 93 or Exit 54 (Washington Street) from southbound Interstate 95/Route 128.

<span class="mw-page-title-main">MBTA Commuter Rail</span> Greater Boston commuter rail system

The MBTA Commuter Rail system serves as the commuter rail arm of the Massachusetts Bay Transportation Authority's (MBTA's) transportation coverage of Greater Boston in the United States. Trains run over 394 mi (634 km) of track to 134 stations. It is operated under contract by Keolis, which took over operations on July 1, 2014, from the Massachusetts Bay Commuter Railroad Company (MBCR).

<span class="mw-page-title-main">Boston and Lowell Railroad</span> Former railroad in Massachusetts, United States

The Boston and Lowell Railroad was a railroad that operated in Massachusetts in the United States. It was one of the first railroads in North America and the first major one in the state. The line later operated as part of the Boston and Maine Railroad's Southern Division.

<span class="mw-page-title-main">Oak Grove station</span> Transit station in Malden, Massachusetts, US

Oak Grove station is a Massachusetts Bay Transportation Authority (MBTA) intermodal transit station in the northern section of Malden, Massachusetts, just south of the Melrose border. It is the northern terminus of the rapid transit Orange Line and a stop on the Haverhill Line commuter rail service. The accessible station has a 788-space park and ride lot and is served by three MBTA bus routes.

<span class="mw-page-title-main">Lowell Line</span> MBTA Commuter Rail line

The Lowell Line is a railroad line of the MBTA Commuter Rail system, running north from Boston to Lowell, Massachusetts. Originally built as the New Hampshire Main Line of the Boston & Lowell Railroad and later operated as part of the Boston & Maine Railroad's Southern Division, the line was one of the first railroads in North America and the first major one in Massachusetts.

<span class="mw-page-title-main">Haverhill Line</span> MBTA Commuter Rail line

The Haverhill Line is a branch of the MBTA Commuter Rail system, running north from downtown Boston, Massachusetts through the cities and towns of Malden, Melrose, Wakefield, Reading, Wilmington, Andover, North Andover, Lawrence, and Haverhill.

The Haymarket North Extension is a section of the Massachusetts Bay Transportation Authority's rapid transit Orange Line which currently constitutes the northern section of the line. It runs from North Station through an underground crossing of the Charles River, then along the Haverhill Line right-of-way to Oak Grove station in Malden, Massachusetts. Built to replace the Charlestown Elevated and originally intended to be extended as far as Reading, it opened in stages between 1975 and 1977.

<span class="mw-page-title-main">Haverhill station (Massachusetts)</span> Train station in Haverhill, Massachusetts

Haverhill station is an intercity and regional rail station located in downtown Haverhill, Massachusetts, United States. It is served by Amtrak's Downeaster service and the MBTA Commuter Rail Haverhill/Reading Line; it is the northern terminus of MBTA service on the line. Haverhill is one of two major hubs for MVRTA local bus service; the Washington Square Transit Center is located 15 mile (0.32 km) east of the rail station.

<span class="mw-page-title-main">Melrose Highlands station</span> Train station in Melrose, Massachusetts

Melrose Highlands station is an MBTA Commuter Rail station on the Haverhill Line located in the Melrose Highlands neighborhood of Melrose, Massachusetts. It is the most used station in the city, and was originally planned to be a station on the cancelled extension of the Orange Line to Reading. The station is accessible.

<span class="mw-page-title-main">Wilmington station (MBTA)</span> Train station in Wilmington, Massachusetts, US

Wilmington station is an MBTA Commuter Rail station in Wilmington, Massachusetts served by the Lowell Line. It is located near the intersection of Main Street and Church Street in Wilmington's town center. The station is accessible, with mini-high platforms serving both tracks.

<span class="mw-page-title-main">West Medford station</span>

West Medford station is an MBTA Commuter Rail station in Medford, Massachusetts. It serves the Lowell Line, and is located at West Medford Square.

<span class="mw-page-title-main">McGovern Transportation Center</span> Transit station in Lawrence, Massachusetts, US

The Senator Patricia McGovern Transportation Center, also known as the McGovern Transportation Center or simply Lawrence station, is a transit station in Lawrence, Massachusetts. It serves the MBTA Commuter Rail Haverhill Line and Merrimack Valley Regional Transit Authority local bus service. The station, which opened in 2005, is the latest of seven distinct stations located in Lawrence since 1848; it is located in the city's Gateway District.

<span class="mw-page-title-main">Andover station (MBTA)</span> Train station in Andover, Massachusetts, US

Andover station is an MBTA Commuter Rail station in Andover, Massachusetts. It serves the Haverhill Line. The station has one platform with a mini-high platform for handicapped accessibility serving one track, while the second track lacks a platform. The previous station building, used from 1907 to 1959, is still extant; it was added to the National Register of Historic Places in 1982 as Third Railroad Station.

<span class="mw-page-title-main">Reading station (MBTA)</span> Train station in Reading, Massachusetts, US

Reading station is an MBTA Commuter Rail station in Reading, Massachusetts. It serves the Haverhill/Reading Line. It is located at Lincoln and High Streets on the western fringe of Reading's central business district. The station's historic depot building was built in 1870 by the Boston and Maine Railroad. The station was the terminus of the line from 1959 until the re-extension to Haverhill station in 1979.

<span class="mw-page-title-main">North Wilmington station</span> Train station in Wilmington, Massachusetts, US

North Wilmington station is an MBTA Commuter Rail station in North Wilmington, Massachusetts. It serves the Haverhill Line, and is located off Middlesex Avenue (Route 62). It has some of the most limited station faculties on the MBTA system – a single short non-accessible platform serving the line's single track at the location, with a small parking lot and shelter for passengers. North Wilmington served by most Boston–Haverhill trains except for a small number that use the Wildcat Branch. It is a flag stop except during weekday peak hours.

<span class="mw-page-title-main">Ballardvale station</span> Train station in Andover, Massachusetts, US

Ballardvale station is an MBTA Commuter Rail station on the Haverhill Line, located in the Ballardvale village of Andover, Massachusetts. The station has a single side platform serving a single track.

<span class="mw-page-title-main">Salem Street station</span>

Salem Street station was a short-lived commuter rail station in Wilmington, Massachusetts in use from 1959 to 1967. It was located at the Salem Street crossing. It was established by the Boston and Maine Railroad (B&M) as the sole stop on the Wildcat Branch, in the wake of a restructuring brought on by service cuts. In 1965, the Massachusetts Bay Transportation Authority started funding MBTA Commuter Rail service on the B&M routes, but closed Salem Street in 1967.

<span class="mw-page-title-main">Woburn station (1844–1981)</span> Railroad station in Woburn, Massachusetts

Woburn station was a railroad station on the Woburn Branch, part of the Massachusetts Bay Transportation Authority's Lowell Line.

References

  1. 1 2 3 Karr, Ronald Dale (1995). The Rail Lines of Southern New England. Branch Line Press. pp. 229–242. ISBN   0942147022.
  2. 1 2 Humphrey, Thomas J. & Clark, Norton D. (1985). Boston's Commuter Rail: The First 150 Years. Boston Street Railway Association. pp. 55–70. ISBN   9780685412947.
  3. Karr, Ronald Dale (2010). Lost Railroads of New England (Third ed.). Branch Line Press. p. 86. ISBN   9780942147117.
  4. 1 2 3 4 5 Belcher, Jonathan (22 March 2014). "Changes to Transit Service in the MBTA district" (PDF). NETransit. Retrieved 30 August 2014.
  5. "Lowell Line: Fall/Winter Schedule" (PDF). Massachusetts Bay Transportation Authority. November 2, 2020. Archived from the original (PDF) on November 30, 2020.
  6. "2020/2021 Reduced Service Schedule: Lowell Line" (PDF). Massachusetts Bay Transportation Authority. December 14, 2020.
  7. "Haverhill Line 2021 Spring Schedule" (PDF). Massachusetts Bay Transportation Authority. April 5, 2021. Archived from the original (PDF) on April 5, 2021.
  8. "Lowell Line 2021 Spring Schedule" (PDF). Massachusetts Bay Transportation Authority. April 5, 2021. Archived from the original (PDF) on April 23, 2021.
  9. "Service Disruption September 9 to November 5 on Haverhill Commuter Rail Line" (Press release). Massachusetts Bay Transportation Authority. August 10, 2023.
  10. "Haverhill Line Spring/Summer Schedule" (PDF). Massachusetts Bay Transportation Authority. May 20, 2024. Archived from the original (PDF) on May 21, 2024.
  11. "June Service Changes: MBTA Continues Repair Work to Improve Reliability Across the System" (Press release). Massachusetts Bay Transportation Authority. May 20, 2024.
Template:Attached KML/Wildcat Branch
KML is from Wikidata