Finsterwalde Solar Park

Last updated
Finsterwalde Solar Park
FinsterwaldeSolarPark.jpg
Finsterwalde Solar Park
CountryGermany
Location Finsterwalde, Brandenburg
Coordinates 51°34′16″N13°45′00″E / 51.57111°N 13.75000°E / 51.57111; 13.75000
StatusOperational
Commission date 2010
Owner(s)LHI Leasing (Finsterwalde I)
Blue Forrest Solar Holding (Finsterwalde II and III)
Solar farm
Type Flat-panel PV
Thermal power station
Primary fuel
Power generation
Nameplate capacity 80.7 MW

The Finsterwalde Solar Park was, in November 2010, the world's largest photovoltaic plant with 80.7 MWp. [1] The project is located in Finsterwalde, Germany and is equipped with Q-Cells modules and LDK solar wafers. [2]

The first phase of the project was commissioned in 2009, the second and third in 2010. [3] All phases were developed by Unlimited Energy GmbH. Phase I was sold to LQ Energy GmbH, a joint venture of Q-Cells International and LDK Solar. In 2011, Finsterwalde I was sold to LHI Leasing, a joint venture of Landesbank Baden-Württemberg and Nord/LB. [4]

In 2010, Unlimited Energy sold phase II and III to Q-Cells International. In 2011, Q-Cells sold Finsterwalde II and III to Blue Forrest Solar Holding, a joint venture of DIF Infrastructure and the NIBC European Infrastructure Fund. [5]

See also

Related Research Articles

<span class="mw-page-title-main">BP Solar</span>

BP Solar was a manufacturer and installer of photovoltaic solar cells headquartered in Madrid, Spain, with production facilities in Frederick, MD, India and the People's Republic of China. It was a subsidiary of BP.

<span class="mw-page-title-main">Solar power in Germany</span>

Solar power accounted for an estimated 8.2 per cent of electricity in Germany in 2019, which was almost exclusively from photovoltaics (PV). About 1.5 million photovoltaic systems were installed around the country in 2014, ranging from small rooftop systems, to medium commercial and large utility-scale solar parks. Germany's largest solar farms are located in Meuro, Neuhardenberg, and Templin with capacities over 100 MW.

SunEdison, Inc. is a renewable energy company headquartered in the U.S. In addition to developing, building, owning, and operating solar power plants and wind energy plants, it also manufactures high purity polysilicon, monocrystalline silicon ingots, silicon wafers, solar modules, solar energy systems, and solar module racking systems. Originally a silicon-wafer manufacturer established in 1959 as the Monsanto Electronic Materials Company, the company was sold by Monsanto in 1989.

<span class="mw-page-title-main">Strasskirchen Solar Park</span> Photovoltaic power station in Bavaria,

The Strasskirchen Solar Park is a large photovoltaic power station in Bavaria, with an installed capacity of 54 MW. It was developed by a joint venture of MEMC and Q-Cells in 2009. At this time this Solar Park was the second largest PV Power Plant. Q-Cells also provided the solar modules for the facility which is located in Straßkirchen, Bavaria, Germany.

Enviromena is a clean energy technology company in Europe. It has installed more than 17,000 solar systems. The company has over 425 MW of solar power plants under operation and a further 200 MW under construction.

<span class="mw-page-title-main">Sarnia Photovoltaic Power Plant</span> Photovoltaic power station in Ontario, Canada

Sarnia Photovoltaic Power Plant near Sarnia, Ontario, is Canada's largest photovoltaic plant with an installed capacity of 97 MWP (80 MWAC).

<span class="mw-page-title-main">Solar power in Greece</span>

Development of solar power in Greece started in 2006 and installations of photovoltaic systems skyrocketed from 2009 because of the appealing feed-in tariffs introduced and the corresponding regulations for domestic applications of rooftop solar PV. In 2019, 90% of the around 2.5 GWp capacity was installed in 2011, 2012 and 2013. However, funding the FITs created an unacceptable deficit of more than €500 million in the Greek "Operator of Electricity Market" RES fund. To reduce that deficit, new regulations were introduced in August 2012 including retrospective feed-in tariffs reduction, with further reductions over time. These measures enabled the deficit to be erased by 2017.

Gehrlicher Solar AG is a German photovoltaics corporation with its registered office in Neustadt near Coburg and its administrative headquarters in Dornach near Munich. Gehrlicher Solar AG acts as a system integrator, planning, building, financing, maintaining and operating photovoltaic systems on open areas and roofs. In addition, the corporation acts as a wholesaler for solar modules, inverters and complete photovoltaic systems as well as offering its own developed components from the „GehrTec“ family of products.

Ernsthof Solar Park is a photovoltaic power station near Dörlesberg, Wertheim, Germany. It has a capacity of 34.4 MWp making it the largest Solar Park in the state of Baden-Württemberg. Phase I of 6.88 MWp and covering an area of 16.6 hectares, consisted of 31,280 modules by LDK Solar Energy Systems was completed on March 30, 2010. The second phase of 7.25 MWp was completed in December 2010, and it was expanded to 29.5 MW and then to 34.4 MW, with over 120,000 modules being fitted in December. Ernsthof East is 6.8 MW and Ernsthof West is 27.5 MW. The total area is 85 ha. Ernsthof is part of the Tauberlandpark, a planned 72 MW solar park consisting of Ernsthof and Solarpark Gickelfeld, which has been delayed due to the political uncertainty of solar parks of over 10 MW receiving the FIT. They may need, instead, to sign a Power Purchase Agreement with the grid distribution power company, which is better than subdividing large projects into multiple smaller segments just to qualify for the FIT.

Reckahn Solar Park is a photovoltaic power station in Reckahn, southwest of Berlin, Germany. It has a capacity of 37.7 megawatt (MW) and was constructed in three phases. Reckahn I was 22.661 MW covering 56 hectares and was built by Beck Energy GmbH (Belectric) using 292,000 First Solar thin-film CdTe-panels, and was expected to produce about 22 gigawatt-hours per year. Reckahn II added 13.3 MW, using 172,000 modules on a 35 hectares site. Reckahn III, completed in 2011, added 1.8 MW, bringing the total to 37.7 MW. The FIT is 21.1 Euro cents per kilowatt-hour.

WIRSOL Solar AG is an international solar energy provider, specialized in the planning, financing, construction and maintenance of solar power plants of any size. The headquarters of the company is in Germany. Further company offices are located in Spain, Italy, Great Britain, Belgium, Switzerland, Canada, USA, China, Malaysia and the Maldives.

CGN's Xitieshan Solar Park is a 100 megawatt (MW) photovoltaic power station located in the Qinghai Province, China. Construction was completed in three phases, Xitieshan Phase I was 10 MW, Xitieshan Phase II was 30 MW, and Xitieshan Phase III was 60 MW. It was completed on 30 September 2011, and at the time was the largest grid connected photovoltaic power station in the world.

Fonroche Énergie is a French company, founded in 2008 by Yann Maus. Its headquarters are in Roquefort, Lot-et-Garonne, in the French department of Lot-et-Garonne. Its core business is renewable and alternative energy.

Mount Signal Solar, also known as Imperial Valley Solar Project, is a 794 MWp (614 MWAC) photovoltaic power station west of Calexico, California, United States, in the southern Imperial Valley, near the Mexican border. The facility is being developed and constructed by 8minutenergy Renewables in three phases, with two completed as of 2018. At full build-out, it will be one of the world's largest PV solar farms with a capacity of about 800 MWp (600 MWAC). The project has been supported by several environmental groups, as the power station was built on low productivity farmland.

<span class="mw-page-title-main">Krughütte Solar Park</span> Photovoltaic power station in Eisleben, Germany

The Krughütte Solar Park is a 29.1-megawatt (MW) photovoltaic power station in Eisleben, Germany.

<span class="mw-page-title-main">Qcells</span> Photovoltaic cell manufacturer

Hanwha Qcells is a major manufacturer of photovoltaic cells. The company is headquartered in Seoul, South Korea, after being founded in 1999 in Bitterfeld-Wolfen, Germany, where the company still has its engineering offices. Qcells was purchased out of bankruptcy in August 2012 by the Hanwha Group, a South Korean business conglomerate. Qcells now operates as a subsidiary of Hanwha Solutions, the group's energy and petrochemical company.

The Eubank Landfill Solar Array is a photovoltaic power station in Albuquerque, New Mexico that consists of 1.0 MWAC of concentrator photovoltaics (CPV) and 1.0 MWAC of flat-panel silicon photovoltaics (PV). It is the only utility-scale CPV system utilizing Suncore third-generation technology that is operational and grid-connected in the US. A portion of the output is being sold to PNM under a Power Purchase Agreement.

8minute Solar Energy is an American photovoltaic (PV) developer of utility-scale PV power plants and energy storage.

3Sun is a photovoltaic panel factory established in 2010 in Catania, Italy. In 2015, Enel Green Power became the company's sole shareholder. 3Sun was established as a joint venture by Enel Green Power, Sharp Corporation, and STMicroelectronics, each owning 33% of 3Sun. Between 2011 and 2014, 3Sun built a photovoltaic cell and module plant in Catania that employed thin-layer technology. Sharp contributes the amorphous silicon multi-junction thin-film technology, Enel Green Power manages the commercial distribution, and STMicroelectronics provides personnel specialized in processes and research and development. On March 6, 2015, Enel Green Power has been the sole owner of 3Sun.

References

  1. Large-scale photovoltaic power plants ranking 1 - 50
  2. eXenewable Project Profile Page - Finsterwalde, PV, Germany
  3. "Implementation of the 39 MWp – "Solar Park Finsterwalde II and Finsterwalde III"" (PDF). Archived from the original (PDF) on 2010-09-11. Retrieved 2010-11-17.
  4. "Nord/LB and LBBW close on Finsterwalde solar acquisition". Project Finance Magazine. 2011-03-21. (subscription required). Retrieved 2011-12-29.
  5. Olson, Syanne (2011-07-26). "Q-Cells closes sale of 40MW PV projects to DIF, NIBC joint venture Blue Forrest Solar Holding". PV Tech. Retrieved 2011-12-29.