StatusOperational
Commission date 2001
Owner(s) Vattenfall
Operator(s) Nuon Renewables
Wind farm
Type Onshore
Power generation
Units operational11
Nameplate capacity 8.4 MW

Parc Cynog is a wind farm operated by Nuon Renewables in Wales. [1] [2]

Parc Cynog Windfarm was built in 2001, and currently consists of eleven wind turbines.

There were originally five turbines on site which are Micon M1800-750/48 turbines built in 2001, by 2009, a further six turbines were installed by Enercon Wind Energy; the technology used was Enercon E48.

The windfarm is owned by Vattenfall. [3]

Related Research Articles

<span class="mw-page-title-main">Windpark Holtriem</span>

The Windpark Holtreim wind farm is a wind farm in Lower Saxony, Germany Constructed in 1998, Windpark Holtriem is one of the largest European windfarms, comprising thirty-three Enercon E-66 wind turbines. Holtriem is a low-lying area adjacent to the North Sea in East Frisia.

<span class="mw-page-title-main">Wind power in the United Kingdom</span>

The United Kingdom is the best location for wind power in Europe and one of the best in the world. The combination of long coastline, shallow water and strong winds make offshore wind unusually effective.

The Thanet Wind Farm is an offshore wind farm 7 miles (11 km) off the coast of Thanet district in Kent, England. On commissioning it was the world's largest offshore wind farm. It has a nameplate capacity of 300 MW and it cost £780–900 million (US$1.2–1.4 billion). Thanet is one of fifteen Round 2 wind projects announced by the Crown Estate in January 2004 but the first to be developed. It was officially opened on 23 September 2010, when it overtook Horns Rev 2 as the biggest offshore wind farm in the world. It has since been overtaken by many others.

<span class="mw-page-title-main">Wind power in Scotland</span>

Wind power is the fastest-growing renewable energy technology in Scotland, with 11,482 megawatts (MW) of installed wind power capacity by Q1 2023. This included 9,316 MW from onshore wind in Scotland and 2,166 MW of offshore wind generators.

<span class="mw-page-title-main">Egmond aan Zee Offshore Wind Farm</span> Dutch offshore wind farm in the North Sea

Offshore Windpark Egmond aan Zee (OWEZ) is an offshore wind farm in the Dutch part of the North Sea, located approximately 10 km from the coast near Egmond aan Zee. It was the first large-scale offshore wind farm to be built off the Dutch North Sea coast. The wind farm was built by NoordzeeWind, a joint venture consisting of Shell and Nuon.

<span class="mw-page-title-main">Gwynt y Môr</span>

Gwynt y Môr is a 576-megawatt (MW) offshore wind farm located off the coast of north Wales and is the fifth largest operating offshore windfarm in the world. The farm has 160 wind turbines of 150 metres (490 ft) tip height above mean sea level.

<span class="mw-page-title-main">Kentish Flats Offshore Wind Farm</span>

The Kentish Flats Offshore Wind Farm is a wind farm located off the coast of Kent, England on a large, flat and shallow plateau just outside the main Thames shipping lanes. The wind farm is operated by Vattenfall.

The Markbygden Wind Farm is a series of interconnected wind farms in the Markbygden area west of Piteå, Norrbotten County in northern Sweden. The project is expected to be completed by 2025 and could have a total capacity of up to 4,000 megawatts (MW), comprising up to 1,101 wind turbines. The project was initially co-developed by Svevind AB and wind turbine manufacturer Enercon. Combined the Markbygden Wind Farm is already the biggest wind farm in Europe, on track to be one of the biggest onshore windfarms in the world.

<span class="mw-page-title-main">DanTysk</span>

DanTysk is a 288 megawatt (MW) offshore wind farm in the North Sea 70 kilometres (43 mi) west of the island Sylt, in the German EEZ at the border to Denmark. The wind farm operates 80 Siemens Wind Power's SWT-3.6-120 turbines with a capacity of 3.6 MW each.

<span class="mw-page-title-main">Wind power in the Netherlands</span>

As of November 2023, wind power in the Netherlands has an installed capacity of 11,602 MW, 40.9% of which is based offshore. In 2022, the wind turbines provided the country with 18.37% of its electricity demand during the year. Windmills have historically played a major part in the Netherlands by providing an alternative to water driven mills.

Vattenfall UK is a subsidiary of Vattenfall headquartered in London. It generates renewable energy, primarily through wind farms.

<span class="mw-page-title-main">Delabole wind farm</span> Wind farm in Cornwall, England

The Delabole wind farm was the first commercial onshore wind farm built in the United Kingdom, in November 1991. This field of wind turbines was initially developed by Windelectric Management Ltd.

Viking Wind Farm is a large on-shore wind farm under construction in the Shetland Islands which is being developed by Viking Energy, a partnership between Shetland Islands Council and SSE plc. When complete, it will have a generation capacity of 443 MW.

Pen y Cymoedd is a wind farm located between Neath and Aberdare in south Wales. It opened in 2017.

Soma Wind Farm is an onshore wind power plant in Soma in Manisa Province in the northwestern Aegean Region of Turkey. Built in two phases and consisting of 119 wind turbines with an installed output power of 140 MW in total, it is one of Turkey's largest wind farms.

<span class="mw-page-title-main">Askam and Ireleth Wind Farm</span>

Askam and Ireleth Wind Farm is a group of 7 turbines located two kilometers east of the village Askam and Ireleth, on the southern slopes of Hare Slack Hill. Work on the turbines started in late 1998, and the wind farm took eight months to complete. It first generated energy in July, 1999.

The European Offshore Wind Deployment Centre (EOWDC), also known as the Aberdeen Bay Wind Farm is an offshore wind test and demonstration facility located around 3 kilometres off the east coast of Aberdeenshire, in the North Sea, Scotland. It was developed by the European Offshore Wind Deployment Centre consortium. The scheme is relatively small - it consists of 11 wind turbines with an installed capacity of 93.2 megawatts. It is located between Blackdog and Bridge of Don near Aberdeen. First power was generated in July 2018, with full commissioning following in September 2018.

<span class="mw-page-title-main">East Anglia Array</span>

The East Anglia Array is a proposed series of offshore wind farms located around 30 miles off the east coast of East Anglia, in the North Sea, England. It has begun with the currently operational East Anglia ONE, that has been developed in partnership by ScottishPower Renewables and Vattenfall. Up to six individual projects could be set up in the area with a maximum capacity of up to 7.2 GW. The first project, East Anglia ONE at 714 MW, received planning consent in June 2014 and contracts in April 2016. Offshore construction began in 2018 and the project was commissioned in July 2020. It is expected to cost £2.5 billion.

Kilgallioch Wind Farm is a 96 turbine wind farm in South Ayrshire, Scotland with a total capacity of up to 239 megawatts (MW). Consent granted by the Scottish Government in February 2013 with construction starting in 2015 and completed in 2017. The wind farm contains 70 km of internal tracks, and a surface area of roughly 32 km2.

References

  1. "Parc Cynog Wind Farm". nuonrenewables.com. Archived from the original on 7 December 2010. Retrieved 7 March 2017.
  2. Richard, Craig. "Vattenfall learns from hybrid and co-location projects". www.windpowermonthly.com.
  3. "Parc Cynog". corporate.vattenfall.co.uk . Retrieved 7 March 2017.