Metro Red Line (Minnesota)

Last updated

METRO Red Line
Cedar RedLineLogo.png
METRO Red Line bus at MOA in 2022.jpg
Red Line bus at Mall of America station in 2022.
Overview
System Metro
Operator Metro Transit
Vehicle Gillig Low Floor BRT Plus 40'
StatusOperational
Began serviceJune 22, 2013 [1]
Route
Route typeHighway bus rapid transit
Locale(Hennepin County)
Bloomington, Minnesota
(Dakota County)
Eagan, Minnesota
Burnsville, Minnesota
Apple Valley, Minnesota
Planned:
Rosemount, Minnesota
Farmington, Minnesota
Lakeville, Minnesota
Start Mall of America
ViaMN-77.svg MN 77 (Cedar Avenue)
End Apple Valley
Length10.1 miles (16.3 km)
Stations5 (7 planned)
Service
LevelDaily
FrequencyEvery 20 minutes
Weekend frequencyEvery 30 minutes
Journey time20 minutes
Operates4:00am – 12:00am
 {{{previous_line}}} {{{system_nav}}} {{{next_line}}} 

The Metro Red Line is a bus rapid transit line between the Twin Cities suburbs of Bloomington, Minnesota and Apple Valley, Minnesota. The Red Line travels primarily on Minnesota State Highway 77 and Cedar Avenue from the Apple Valley station in Apple Valley, north through Eagan, Minnesota, to the Mall of America station in Bloomington where it connects to the Metro Blue Line. The line has bus rapid transit elements including bus-only lanes, specially branded vehicles, transit signal priority, and dedicated stations.

The line was designed to ease traffic congestion along the Cedar Avenue corridor. During planning the project was known as the Cedar Avenue Bus Rapid Transitway until it was renamed the Red Line in 2011 as part of a regional branding of the Metro system. After a few construction schedule setbacks, the line officially began operation on June 22, 2013. The Red Line cost $21 million but a further $34 million was spent on express bus service upgrades, and $57 million on roadway expansion for a total project cost of $112 million. A further $15 million was spent to construct an improved passenger station that no longer requires buses to exit the highway and saves 10 minutes on a round trip journey. The line was operated by the Minnesota Valley Transit Authority under a contract from the Metropolitan Council until December 5, 2020, when Metro Transit took over operations.

An extension to Lakeville is planned with an opening in 2040.

Route description

The Red Line's northern terminus is Mall of America station at the Mall of America in Bloomington. At the station are connections to eight bus routes and the Metro Blue Line. From the Mall of America, the route travels on Minnesota State Highway 77 and serves the Cedar Grove Transit Station which has bus stops in the middle of the highway with an indoor walkway to a park-and-ride lot adjacent to the highway near the Twin Cities Premium Outlets shopping mall. The route crosses Interstate 35E and serves two stations at 140th and 147th streets. The final stop is at the Apple Valley Transit Station. [2]

Service and operation

The Red Line aimed for 975 daily rides in its first year. [3] While in the Red Line's first year of operation MVTA's ridership numbers reached record levels, [4] ridership on the line in the first few years was lower than expected. [5] Ridership reached only 85% of projected rides in the first year. [6] Ridership was estimated to reach 1,600 per day by 2017. [7]

From 2013 to 2017 half of the Red Lines budget came from the Counties Transit Improvement Board and half from the Metropolitan Council. After the Counties Transit Improvement Board was dissolved, the Metropolitan Council supported the full budget of the Red Line. [8] Dakota County's portion of the Red Line's budget was $1.3 million in 2017. [9] The MVTA operated the Red Line through a contract with the Metropolitan Council and cost $3.2 million in 2020 to provide the service. After first discussing the plan with MVTA in July 2020, the Metropolitan Council announced that it would not renew its operating contract with MVTA, instead opting for Metro Transit to take over operations starting on December 5, 2020. Frequency and hours of operations are planned to remain unchanged. [8] [10]

Ridership in 2019 was 242,372 rides for a subsidy of $9.97 per passenger. The other two bus rapid transit lines in the Metro system, the A Line and the C Line, had subsidies of $3.85 per passenger and light rail service cost $1.96 per passenger. Suburban local and commuter express bus subsidy for MVTA, which is the territory the Red Line operates in, was $12.10 and $6.07 per passenger trip respectively, which is higher than the Twin Cities region subsidies of $7.38 and $5.52 per passenger trip respectively. [11]

Red Line buses run mostly on bus-only lanes and have transit signal priority. [4] [12] Trips to downtown Minneapolis from Apple Valley station that take the Red Line to the Blue Line take about an hour versus 40-43 minutes on an express bus. [7]

Fleet

Temporary Red Line bus wrapped in Metro Transit BRT livery between use of Nova bus and Gillig BRT Plus vehicles. Red Line MOA station.jpg
Temporary Red Line bus wrapped in Metro Transit BRT livery between use of Nova bus and Gillig BRT Plus vehicles.

The Red Line initially operated using Nova Bus LFX 40' buses (4252-4258), the first and only in the Twin Cities. Buses were chosen to provide a riding experience closer to that of riding a train with larger windows, interior space for bikes, an exterior designed to be similar to light rail vehicles. Station and bus design allows for level boarding for passengers. The vehicle design was chosen out of three other competitors and had been available on the market for five years before being purchased by the Metropolitan Council. The seven buses purchased cost between $450,000-$550,000 each. [13] All buses were equipped with lane departure warning systems and collision avoidance system advisories. [14] The original interior bike racks were replaced with exterior bike racks several months after opening. [15]

These buses were retired in December 2020 when Metro Transit took over operations from MVTA. Until 2022, the route has been operated by 7 40' Gilligs temporarily wrapped in the METRO livery (1750–1756). During this time the Metropolitan Council was preparing to replace the fleet with permanent buses similar to those on the A Line. [8] These buses 6 40' Gilligs (8020-8025) entered service in December 2022.

Stations and transit way

Cedar Avenue was reconstructed with new bus shoulder lanes for easier travel between Downtown Minneapolis and Lakeville. The transit way begins at Mall of America and heads towards Eagan, Apple Valley and Lakeville with bus shoulder lanes on both sides of Cedar Avenue, making it easier to bypass traffic. Stations were designed with bus pull-offs to allow buses to pass other buses picking up and dropping off passengers.[ citation needed ] Buses in the 12 feet (3.7 m) reinforced shoulder lanes are allowed to travel up to 15 miles per hour (24 km/h) faster than regular traffic as long as they are within the speed limit. [7]

A view from the Cedar Grove Transit Station at the platform in the median of Minnesota State Highway 77 Cedar Grove Station from platform.jpg
A view from the Cedar Grove Transit Station at the platform in the median of Minnesota State Highway 77

At Cedar Grove, buses used to exit the highway to use Cedar Grove Transit Station. This routing added about 10 minutes on a round trip which lowered ridership. [5] A center-median Cedar Grove station serving the Red Line opened May 20, 2017. This reduced travel time, as buses no longer exit the freeway. The 300-foot climate-controlled walkway over Cedar Avenue connects the new station to the existing transit station. [16] The passenger platform and walkway cost $15 million with $10.4 coming from the Counties Transit Improvement Board, $3.3 from the state of Minnesota, and $1.3 million from Dakota County. [6] The addition of the station was estimated to add 40,000 annual rides to the Red Line and save $293,000 in annual operational costs. [17]

Stations at 140th St and 147th St were included to serve local businesses and neighborhoods. Apple Valley elected officials were concerned about the lack of parking lots at the stations and that riders would park at local businesses and side streets. After population and employment projections for the corridor were shrunk during the Great Recession, station designs shrunk and planned skyway connections over Cedar Ave removed due to lower ridership projections. [18] Despite pressure from the city of Apple Valley, the Met Council and Dakota County decided to not construct skyway connections but allowed the station at 147th St to be designed to allow for a future skyway connection. [19] Apple Valley has applied for federal funding through the Met Council to construct the 147th St skyway in 2016, 2018, 2020, and 2022 under the Transit Modernization category. [20] [21] [22] [23] The Minnesota legislature included $7 million to construct the skyway in their 2023 session. [24] [25] Dakota County has applied through the same funding source for a pedestrian and bicycle bridge at 140th St in 2018, 2020, and 2022. [26] [27] [28] The $2.9 million project was awarded $2 million as part of the 2022 grant cycle. [29]

A redesign of the Mall of America station was estimated to reduce travel times by 2-4 minutes. [3]

From the route's opening on June 22, 2013, until May 19, 2017, northbound Red Line buses used to make an additional stop outside of the Mall of America at 30th Avenue Station.

Station [2] ID [30] CityConnections [2] OpenedFall 2019 Weekday Ridership [31]
Mall of America station 56873 Bloomington 5, 54, 442, 444, 495, 501, 515, 538, 539, 540June 22, 2013375
Cedar Grove Transit Station 56510, 56511 Eagan 440, 442, 444, 445, 475June 22, 2013108
140th Street station48976, 48977 Apple Valley 440June 22, 201323
147th Street station48179, 53494Apple Valley440June 22, 201358
Apple Valley station 56979, 56980Apple Valley420, 440, 442, 447, 475, 477, 480June 22, 2013177

History

Corridor logo from 2007 Cedar Logo2468.JPG
Corridor logo from 2007

Plans for bus rapid transit in the corridor were first started in 1999 with $500,000 in state funding. An extension of the then in development Hiawtha Avenue light rail (Blue Line) was considered and was projected to attract the most riders with up to 23,100 by 2020. Exclusive bus only lanes for the corridor would have cost a fraction of the light rail extension but only attract up to 18,400 riders a day by 2020. Both ridership projections were contingent on dense transit-oriented development along the corridor. [32] Studies on the corridor were extended to Lakeville in 2003 with 2025 ridership expected to be 12,900. [33] Bus rapid transit was selected as the preferred alternative over light rail in 2004. [7] A light rail line was estimated to cost $650 million. [3] A 2010 report estimated 150,000 daily vehicles on Cedar Avenue with volumes expected to double within 20 years. [34] At the Minnesota River crossing, 90,000 vehicles traveled on the Cedar Avenue Bridge. Congestion in the corridor was expected to increase and the Red Line was planned to assist with easing congestion. Construction on upgrades to Cedar Avenue were started in April 2009 and included upgrades for buses, lane expansion for automobiles, and wider sidewalks for pedestrians. [7] [1]

Apple Valley Transit Station, which also serves other local and express routes, under construction in October 2012 before opening. Apple Valley Transit Station (9098361678).jpg
Apple Valley Transit Station, which also serves other local and express routes, under construction in October 2012 before opening.

The total cost for the project was $112 million. [6] Only $21 million was for the Red Line itself with $34 million spent on express service upgrades and $57 million spent on roadway expansion. [35] [36] The majority of the project cost (80%) was split 3 ways with the federal government, the state of Minnesota, and the Counties Transit Improvement Board each covering $19.7 million. The remaining 20% of the project budget was covered by counties and local government. [37]

In July 2011, the Metropolitan Council officially designated the Cedar Avenue BRT line as the Red Line. This is part of a broader scheme to designate transit lines by color. Corresponding lines within the system include the Blue Line, the Green Line, and the then under development Orange Line BRT along Interstate 35W. [38] Dakota County commissioners were not pleased with the branding design decision and sought a more "vibrant" logo and design separate from light rail and regular buses. [39] As late as spring 2012 a November 2012 opening was expected but the line ultimately opened on June 22, 2013, with free rides offered for the first week. [1] [40]

City officials believed that the Red Line factored into some real estate developers' decisions to develop projects worth $273 million within .5 miles (800 m) corridor. [41] A 2015 Cedar Avenue Transitway Implementation Plan Update set plans for additional stations and an extension to Lakeville, Minnesota. The extension to Lakeville isn't planned to open until 2040. [42]

See also

Related Research Articles

<span class="mw-page-title-main">Metro Blue Line (Minnesota)</span> Light rail line in Hennepin County, Minnesota

The Metro Blue Line is a 12-mile (19.3 km) light rail line in Hennepin County, Minnesota, that is part of the Metro network. It travels from downtown Minneapolis to Minneapolis–Saint Paul International Airport and the southern suburb of Bloomington. Formerly the Hiawatha Line prior to May 2013, the line was originally named after the Milwaukee Road's Hiawatha passenger train and Hiawatha Avenue, reusing infrastructure from the former and running parallel to the latter for a portion of the route. The line opened June 26, 2004, and was the first light rail service in Minnesota. An extension, Bottineau LRT, is planned to open in 2028.

Metro Transit is the primary public transportation operator in the Minneapolis–Saint Paul area of the U.S. state of Minnesota and the largest operator in the state. Metro Transit has previously been ranked as one of the best public transit systems in the United States. In 2023, the system had a ridership of 44,977,200, or about 145,600 per weekday as of the fourth quarter of 2023.

<span class="mw-page-title-main">Metro Green Line (Minnesota)</span> Light rail transit line in Minnesota, US

The Metro Green Line is an 11-mile (18 km) light rail line that connects the central business districts of Minneapolis and Saint Paul in Minnesota as well as the University of Minnesota. An extension is under construction that will extend the line to the southwest connecting St. Louis Park, Hopkins, Minnetonka and Eden Prairie. The line follows the path of former Metro Transit bus route 16 along University Avenue and Washington Avenue. It is the second light-rail line in the region, after the Blue Line, which opened in 2004 and connects Minneapolis with the southern suburb of Bloomington.

<span class="mw-page-title-main">Mall of America station</span> Light rail and bus station in Bloomington, Minnesota

The Mall of America station is the busiest transit center in Minnesota, with bus and light rail service linking the Mall of America to many destinations in the Minneapolis–St. Paul metro. Public transit service is provided by Metro Transit and the Minnesota Valley Transit Authority. The station is served by Metro Blue Line, Red Line, and D Line. The station previously hosted private shuttle services to hotels and Mystic Lake Casino until those services moved to a new charter bus terminal on the north side of the mall in 2015.

<span class="mw-page-title-main">Minnesota Valley Transit Authority</span> Public transportation agency in Minnesota, US

The Minnesota Valley Transit Authority, also known by the acronym MVTA, is a public transportation agency that serves seven communities in the southern portion of the Minneapolis–Saint Paul metropolitan area. The agency provides fixed-route and demand-responsive transit within the service area of the communities and to select destinations in the region.

The Metro Purple Line, formerly known as the Rush Line Corridor, is a proposed bus rapid transit service that would run from Union Depot in downtown Saint Paul to the northeastern suburbs of Saint Paul. Along the corridor's 21 proposed stations there are 106,000 jobs within a 10-minute walk. The project is currently in an environmental analysis phase with further development, engineering, and construction expected to take at least six more years. Service would run 7-days a week with 10-minute headways in peak periods and 15-minute service at most other times. The corridor was named the Rush Line because it was originally planned to end in Rush City, Minnesota. After using the color purple since 2017, the route was officially named the Purple Line and became part of the Metro network on July 14, 2021.

<span class="mw-page-title-main">Burnsville Transit Station</span> Transit facility in Burnsville, Minnesota

Burnsville Transit Station is a transit facility located in the vicinity of downtown Burnsville, Minnesota, and is the flagship station of the Minnesota Valley Transit Authority (MVTA). The station is the busiest park and ride location in the Twin Cities region and offers approximately 1,400 parking spaces. It is also a major transfer hub for routes operating the south of the Minnesota River. The station has indoor climate-controlled waiting, restrooms, lost and found, drinking fountains, vending machines, Go-To card sales, newspaper racks, and transit information. Due to high park and ride demand, MVTA moved some service to the 370 space Heart of the City public ramp about a 12 mile (0.80 km) south in 2018. The Metropolitan Council's 2021 park-and-ride system report found 267 cars parked at the station compared to 1,116 in 2019 before the COVID-19 pandemic.

The Bottineau LRT is a proposed light rail line extension in the Minneapolis – Saint Paul Metro area, projected to run northwest from Target Field station in downtown Minneapolis along County Road 81 to Brooklyn Park.

<span class="mw-page-title-main">Metro Orange Line (Minnesota)</span> Minnesota bus line

The Metro Orange Line is a bus rapid transit line in the Twin Cities, Minnesota operated by Metro Transit. The line operates primarily along Interstate 35W from downtown Minneapolis through Richfield and Bloomington before terminating in Burnsville, Minnesota. The Orange Line provides access to 198,000 jobs with roughly a quarter of them outside downtown Minneapolis. The route serves a mix of stations located in the center of the highway, stations near highway exits, and on-street stations. The line has features typical of bus rapid transit systems with off-board fare payment, articulated buses with extra doors, stations with improved passenger amenities, and transit-only bus lanes on portions of the route.

<span class="mw-page-title-main">Apple Valley station</span> Transit facility in the United States

The Apple Valley Transit Station is a transit facility located in Apple Valley, Minnesota. It is owned by the City of Apple Valley and the MVTA. The transit station is near Cedar Avenue and Gaslight Drive. This station has 337 parking spaces and is almost full almost each weekday. It also serves the nearby communities of Lakeville and Farmington.

<span class="mw-page-title-main">Eagan Transit Station</span>

The Eagan Transit Station is a transit facility located in Eagan, Minnesota. Riders also hail from the nearby communities of Mendota Heights and Northern Rosemount. The Park & Ride lot has 750 parking spaces for bus passengers and retail employees.

The Metro G Line, previously known as the Robert Street Corridor, is a proposed bus rapid transit corridor, from Little Canada to West Saint Paul via downtown Saint Paul on Rice and Robert Streets. Robert Street is named after Captain Louis Robert, an early resident of Saint Paul. The corridor's population is expected to grow 45% and 27% more jobs are expected to come to the area from 2000 to 2030. In the 2006 state bonding bill, $500,000 was set aside to study the feasibility of adding mass transit. Robert Street, the south portion of the corridor, was also studied for light rail improvements. In the Metropolitan Council's 2030 Transportation Policy Plan Robert Street is one of nine arterial streets that are recommended for bus rapid transit. Six of the nine corridors would be built by 2020 and the remaining three would be built by 2030. In February 2021, the corridor was selected to be implemented as the G Line.

<span class="mw-page-title-main">Cedar Grove Transit Station</span>

The Cedar Grove Transit Station is a transit facility in Eagan, Minnesota. It serves the Minnesota Valley Transit Authority bus system and the Metro Red Line bus rapid transit system. It opened March 20, 2010, in the Cedar Grove community.

<span class="mw-page-title-main">I-35W & Lake Street station</span> Bus rapid transit station in Minneapolis

I-35W & Lake Street station is a bus rapid transit station along the Metro Orange Line and planned B Line bus rapid transit (BRT) routes in Minneapolis, Minnesota. In addition to the BRT services, the station is also served by Metro route 578, Minnesota Valley Transit Authority routes 460, 465, 467, 470, 472, 475 and 477, along with SouthWest Transit routes 600 and 695.

<span class="mw-page-title-main">Metro (Minnesota)</span> Rapid transit network in the Minneapolis metropolitan area of the United States

Metro is a transit network in Minnesota serving the cities of Minneapolis and Saint Paul. It also provides service to some suburban areas. As of 2022, the system consists of two light rail lines and five bus rapid transit (BRT) lines all of which are operated by the local public transit company: Metro Transit. The five lines connect Downtown Minneapolis and St Paul with the Bloomington, Minneapolis-St Paul International Airport, Roseville, Richfield, Burnsville and Brooklyn Center.

<span class="mw-page-title-main">Metro A Line (Minnesota)</span> Bus rapid transit line in the Minneapolis metropolitan area of the United States

The Metro A Line is a bus rapid transit line in the Twin Cities, Minnesota operated by Metro Transit. The A Line operates primarily along the Snelling Avenue corridor and travels through the cities of Minneapolis, Saint Paul, Falcon Heights, and Roseville. From the Blue Line in Minneapolis, the line travels past Minnehaha Park, through the Highland Village commercial area, past Macalester College, and connects to the Green Line near Allianz Field. The line continues through Saint Paul, past Hamline University, before traveling through Falcon Heights and Roseville, where the line passes the Minnesota State Fairgrounds, Har Mar Mall, and terminates at Rosedale Center.

<span class="mw-page-title-main">Metro C Line (Minnesota)</span> Bus rapid transit line in the Minneapolis metropolitan area of the United States

The Metro C Line is a bus rapid transit line in Brooklyn Center and Minneapolis, Minnesota operated by Metro Transit. The line is part of Metro Transit's Metro network of light rail and bus rapid transit lines. The route operates from the Brooklyn Center Transit Center along Penn Avenue and Olson Memorial Highway, terminating in downtown Minneapolis. The route is analogous to the existing Route 19 and is projected to increase ridership on this corridor from 7,000 to 9,000 by 2030. Eventually, part of its route will shift south to Glenwood Avenue from Olson Memorial Highway.

<span class="mw-page-title-main">Metro D Line (Minnesota)</span> Bus rapid transit line in the Minneapolis metropolitan area of the United States

The Metro D Line is a bus rapid transit line in Minneapolis-Saint Paul, Minnesota. The 18.5-mile (29.8 km) route primarily operates on Fremont and Chicago Avenues from Brooklyn Center through Minneapolis to the Mall of America in Bloomington. As part of BRT service, the D Line features "train-like amenities" including improved station facilities, off-board fare payment, modern vehicles, fewer stops, and higher frequency. The current alignment would substantially replace the existing Route 5, the highest ridership bus route in Minnesota.

<span class="mw-page-title-main">Metro B Line (Minnesota)</span> Planned bus rapid transit line in the Minneapolis metropolitan area of the United States

The Metro B Line is an under construction bus rapid transit route in Minneapolis and St. Paul. The route will operate mostly on Lake Street in Minneapolis before crossing the Mississippi River into St. Paul and operating mostly on Selby Avenue and ending in downtown St. Paul. The route was identified in Metro Transit's 2014 Arterial Transitway Corridors Study as one of eleven local routes to be upgraded to bus rapid transit. The route will have "train-like" features to speed up service, such as signal priority, all-door boarding, further stop spacing, and specialized vehicles. Planning and design was completed in 2021, with construction beginning in May 2023. The line will join a number of Metro Transit's future Metro system lines, as well as the currently operating A Line, C Line, and D Line. Full funding for the line was secured in October 2020 with a final $35 million from the state of Minnesota.

References

  1. 1 2 3 Blake, Laurie (June 11, 2013). "Curious about new Cedar BRT? Take a free ride". Star Tribune . p. B3. Retrieved July 31, 2021 via Newspapers.com.
  2. 1 2 3 "Red Line Route Map" (PDF). Metro Transit. December 5, 2020. Retrieved December 23, 2020.
  3. 1 2 3 Van Berkel, Jessie (December 28, 2014). "A hesitant start for rapid busway". Star Tribune. p.  B1, B7 . Retrieved July 31, 2021 via Newspapers.com.
  4. 1 2 Ferraro, Nick (January 15, 2015). "Dakota County rapid transit line boosts 2013 MVTA ridership". TwinCities.com. Pioneer Press. Retrieved July 14, 2016.
  5. 1 2 Van Berkel, Jessie (June 20, 2015). "Short- and long-term changes planned for Red Line BRT". Star Tribune. Retrieved December 28, 2020.
  6. 1 2 3 Moore, Janet (April 28, 2016). "Red Line bus service, which links MOA to south suburbs, to get $15M tune-up". Star Tribune. Retrieved December 29, 2020.
  7. 1 2 3 4 5 Blake, Laurie (June 16, 2013). "BRT is ready to leave the station". Star Tribune. p.  N1, N3-N4 . Retrieved July 31, 2021 via Newspapers.com.
  8. 1 2 3 Harlow, Tim (October 6, 2020). "Metro Transit to take over operation of Red Line bus rapid transit". Star Tribune. Retrieved October 7, 2020.
  9. Callaghan, Peter (May 31, 2017). "Twin Cities transit funding board initiates break-up. Like, for real this time". Minnpost . Retrieved December 29, 2020.
  10. Pan, H. Jiahong (February 9, 2022). "A Battle Over a High-Speed Bus Line Has Transit Agencies Seeing Red - Racket". racketmn.com . Retrieved July 4, 2023.
  11. "2019 REGIONAL ROUTE PERFORMANCE ANALYSIS". Metropolitan Council. November 2020. Retrieved December 30, 2020.
  12. Harlow, Tim (October 14, 2018). "Metro Transit's Route 2 gets retooled for speed". Star Tribune. Retrieved December 29, 2020.
  13. Humphrey, Katie (November 20, 2011). "All Aboard - Bus rapid transit relies on sleek modern buses. For Cedar Avenue, those buses have been revealed". Star Tribune. pp.  N1, N4 . Retrieved July 31, 2021 via Newspapers.com.
  14. Harlow, Tim (February 13, 2015). "A $1.8 million grant is heading MVTA's way". Star Tribune. Retrieved December 28, 2020.
  15. Harlow, Tim (September 25, 2013). "Front-end bike racks arrive on Red Line". Star Tribune. p. B3. Retrieved July 31, 2021 via Newspapers.com.
  16. William, Bornhoft (June 2, 2017). "New Cedar Grove Transit Station Opens In South Metro". Patch: Apple Valley-Rosemount. Retrieved January 16, 2021.
  17. Van Berkel, Jessie (November 20, 2014). "A $10 Million Solution". Star Tribune. p.  B1, B5 . Retrieved July 31, 2021 via Newspapers.com.
  18. Adams, Jim (November 20, 2011). "All Aboard. Two bus stations for new BRT don't come with any parking, worrying some in Apple Valley". Star Tribune. pp.  N1, N4 . Retrieved July 31, 2021 via Newspapers.com.
  19. Humphrey, Katie (April 29, 2012). "Skyway debate may stall busway". Star Tribune. p.  N1, N3 . Retrieved July 31, 2021 via Newspapers.com.
  20. Saam, Matthew (July 15, 2016). "05399 - Apple Valley Red Line BRT 147th Station Skyway". City of Apple Valley via Metropolitan Council. Retrieved December 30, 2020.
  21. Saam, Matthew (July 13, 2018). "10918 - Apple Valley Red Line BRT Skyway". City of Apple Valley via Metropolitan Council. Retrieved December 30, 2020.
  22. Saam, Matthew (May 15, 2020). "14084 - Apple Valley Red Line BRT 147th St. Station Skyway". City of Apple Valley via Metropolitan Council. Retrieved December 30, 2020.
  23. Saam, Matthew (April 14, 2022). "17701 - Apple Valley Red Line BRT 147th St. Station Skyway". City of Apple Valley via the Metropolitan Council. Retrieved August 9, 2022.
  24. Schetnan, Judd (May 23, 2023). "2023 Legislative Session Overview". Metropolitan Council. Retrieved May 26, 2023.
  25. "HF 670 4th Engrossment - 93rd Legislature (2023 - 2024)". Minnesota Legislature. May 24, 2023. Retrieved May 26, 2023.
  26. Anderson, Holly (July 13, 2020). "10963 - CSAH 23 (Cedar Ave)& 140th Street Pedestrian Bridge, METRO Red Line BRT". Dakota County via the Metropolitan Council. Retrieved December 30, 2020.
  27. Morneau, Joseph (May 14, 2020). "14078 - Cedar Avenue Pedestrian Bridge at 140th Street - Apple Valley". Dakota County via Metropolitan Council. Retrieved December 30, 2020.
  28. Morneau, Joseph (April 13, 2022). "17670 - Cedar Avenue Pedestrian Bridge at 140th Street - Apple Valley". Dakota County, Minnesota via the Metropolitan Council. Retrieved August 9, 2022.
  29. "2022 Regional Solicitation – Transportation Advisory Board (TAB) Selected Projects for 2023-2027". Metropolitan Council. Retrieved May 26, 2023.
  30. "Red Line Interactive Map". Metro Transit. Retrieved December 23, 2020.
  31. "Transit Stops Boardings and Alightings" (XML). gisdata.mn.gov. Metropolitan Council. January 4, 2020. Retrieved December 23, 2020.Note: Per metadata, this information is only for looking at stop level ridership and cannot be used for total route level ridership.
  32. Blake, Laurie (November 16, 2000). "Apple Valley: Next stop for light rail?". Star Tribune. p. B2. Retrieved July 31, 2021 via Newspapers.com.
  33. Blake, Laurie (August 3, 2003). "Cedar Av. busway plan grows". Star Tribune. p. B3. Retrieved July 31, 2021 via Newspapers.com.
  34. Van Berkel, Jessie (January 31, 2015). "Dakota County residents to review Cedar Avenue transit". Star Tribune. Retrieved December 28, 2020.
  35. Crotti, Nancy (June 20, 2013). "Red Line ready to roll | Finance & Commerce". Finance & Commerce . Retrieved May 26, 2023.
  36. "Business Item No. 2013-104 SW". Metropolitan Council. March 27, 2014. Retrieved May 26, 2023.
  37. "2015 Legislative Report Guideway Status" (PDF). The Minnesota Department of Transportation. November 2015. Retrieved May 26, 2023.
  38. "Met Council approves line color names for region's developing transitway system". Metropolitan Council. July 2011. Archived from the original on August 7, 2011. Retrieved August 31, 2011.
  39. Doyle, Pat (February 16, 2012). "No agreement on BRT color scheme". Star Tribune. p. B3. Retrieved July 31, 2021 via Newspapers.com.
  40. Blake, Laurie (June 30, 2013). "Parking restrictions eye for area near Cedar BRT line". Star Tribune. p.  N1, N2 . Retrieved July 31, 2021 via Newspapers.com.
  41. Van Berkel, Jessie (November 19, 2015). "Development pops up along Red Line bus rapid transit in Eagan, Apple Valley". Star Tribune. Retrieved December 28, 2020.
  42. "Cedar Avenue Transitway Implementation Plan Update" (PDF). Dakota County, MVTA, Metropolitan Council. December 2015. Retrieved December 29, 2020.
Template:Attached KML/Metro Red Line (Minnesota)
KML is not from Wikidata