Ribble Link

Last updated

The Millennium Ribble Link
Ribble Link 04c232.jpg
The 3-rise staircase locks
Specifications
Maximum boat length 62 ft 0 in (18.90 m)
Maximum boat beam 10 ft 6 in (3.20 m)
Locks8
(1 tidal gate)
StatusNavigable at certain times April–October
Navigation authority Canal & River Trust
History
Original ownerThe Ribble Link Construction and Operation Limited/The Waterways Trust
Principal engineerGleeson
Other engineer(s)Arup Water
Date completed2002
Geography
Start pointLancaster Canal, Ingol, Preston
End pointRiver Ribble

The Millennium Ribble Link is a linear water park and new navigation which links the once-isolated Lancaster Canal in Lancashire, England to the River Ribble. The Lancaster Canal was never connected to the rest of the English waterways network, because the planned aqueduct over the River Ribble was never built. Instead, a tramway connected the southern and northern parts of the canal. An idea for a connecting link following the course of the Savick Brook was proposed in 1979, and the Ribble Link Trust campaigned for twenty years to see it built. The turn of the Millennium, and the funds available from the Millennium Commission for projects to mark the event was the catalyst for the project to be implemented, and although completion was delayed, the navigation opened in July 2002.

Contents

The link is a navigation, as flows on the Savick Brook can be considerable, and there are large weirs and bywashes at each of the locks, to channel water around them. The lower end of the link is tidal, with boats passing over a rotating gate and through a sea lock to gain access. It is open from April to October, but only on certain days, based on the height of the tide, and boats can only travel in one direction on any one day. The cost of construction was nearly twice the original estimate, with just under half of it funded by the Millennium Commission. The project included footpaths, cycle tracks and a sculpture trail, to attract visitors other than boaters to visit it, and to generate economic returns for the local community. Since its construction, maintenance costs have been high, due to voids developing behind some of the lock walls, and the deposition of silt deposited by the incoming tides.

Although the link is strictly the canalisation of the Savick Brook, the Ribble Link is also used to refer to the crossing from Tarleton on the Rufford Branch of the Leeds and Liverpool Canal, 4 miles (6.4 km) of the River Douglas, the 3.5-mile (5.6 km) journey up the River Ribble and passage along the link to the Lancaster Canal. Completing the crossing requires a little more planning than cruising on inland waterways, as the Douglas, the Ribble, and the first part of the link are tidal, but most boats make the crossing successfully. However, the Royal National Lifeboat Institution have responded to a number of callouts, where the Lytham St Annes lifeboat has had to assist vessels which have got into difficulties.

History

When originally planned, the Lancaster Canal would have crossed the River Lune and the River Ribble on aqueducts, and it was intended that there should be a link to the Leeds and Liverpool Canal to the south of the Ribble. [1] The Lune aqueduct was completed in 1797, [2] but the Ribble one was not built, as the construction was well over budget by the time the canal reached Preston. The canal link was eventually replaced by a tramway link, crossing the Ribble on a wooden trestle bridge. [3] The bridge outlasted the tramway, and it was not until the 1960s that it was demolished and replaced by a new pedestrian bridge, made of concrete beams but designed to look like the old timber structure. That structure is also under threat due to degradation of the concrete and corrosion of the steel reinforcement. [4] The Lancaster Canal remained isolated from the rest of the English Canal network. [5]

The idea of building a connecting link between the Lancaster Canal and the rest of the English waterways system was first proposed in 1979 by John Whittaker of the Lancaster Canal Boat Club, and a feasibility study was carried out in 1981, to see if using the Savick Brook would be possible. [6] In 1982 the Lancaster Boat Club organised a cruise from Rufford Branch of the Leeds and Liverpool Canal up the Ribble to Preston Docks to generate publicity for the scheme. [7] The cruise demonstrated that canal boats could navigate on this section of tidal water without difficulty, and the Ribble Link Trust was set up in 1984 to push the idea frowards. [8] Plans were nearly thwarted in 1992, when there were proposals for a bypass around Preston, which would have crossed the Savick Brook at too low a level to leave headroom for boats, and the trust worked hard to get the plans altered. [9]

Boatsonribblelink1.jpeg
Boatsonribblelink2.jpeg
Messingatlocks.jpeg
Pleasure craft use the Ribble Link navigation to pass between the Lancaster Canal and the Leeds and Liverpool canal.

Prior to construction of the Ribble Link starting, British Waterways carried out an archeological evaluation to establish whether any important archeological sites would be disturbed by the new waterway. This identified Mill Field close to lock 8 as the probable location of a water mill, and found evidence of a ridge and furrow field system. Although the visible remains of this were unlikely to be disturbed by the construction work, parts of it continued below the surface where the channel would be excavated, and it was hoped that its boundary ditches might be located when the work took place. [10] The Environment Agency also carried out a fish survey, using electrofishing at eight sites along the brook, to ascertain the health of the brook as habitat for course fish. The fish were categorised as predator species, rheophilic species that prefer flowing water, and limnophilic species that prefer still water. [11] The survey recorded eleven species of fish, with rheophilic species prominent at most of the test sites, and limnophilic species much less so. [12] Flounder were also found in great numbers throughout the river, probably because the sand and silt on the bed of the river provide good habitat for spawning and for the survival of juvenile fish. [13] The report concluded that fish populations were surprisingly high for a river that drained an urban area, and that chub and flounder were doing particularly well. [14]

Flows on the Savick Brook vary considerably, from as little as 110 cubic feet per minute (50 L/s) up to 74,000 cubic feet per minute (35 m3/s). In order to accommodate these flows, weirs which are up to 100 feet (30 m) wide were required at the locks, and the bypass channels generally use the original course of the brook. [15] In order to allow fish to continue to move along the watercourse, fish passes would be built into the weirs. The Environment Agency raised concerns about water quality, but these were withdrawn in March 1999 after North West Water announced that they would soon be building a new interceptor sewer to run close to the Savick Brook, and the Trust agreed to make the channel slightly narrower, to improve flow speeds. [16] When originally conceived, the navigation would have had eight locks, numbered 1 to 8 from the Ribble upwards. Lock 2A was added, to ensure that the level of the pound above lock 2 did not compromise land drainage in the locality. [15] The locks were subsequently renumbered 1 to 9 from the Lancaster Canal downwards, in order to follow the convention used on the Glasson Dock branch. (Care should be taken when reading source documents on the construction, which use the old order). [17]

Ribble Link weir.jpeg
Ribble Link weir2.jpeg
Ribble Link weir3.jpeg
Ribble Link Fish pass.jpeg
The Weir at Lock 5 at different water levels including 'high water' in January 2008, and the fish pass

The original route for the scheme continued along the Savick Brook into Haslam Park, and then followed the Sharoe Brook to reach the Lancaster Canal. [8] However, delays to the start of the project meant that costs kept escalating, without an equivalent increase in funding, and constructing a route that ran alongside Tom Benson Way was a cheaper option. [18] This new route created an impossibly tight turn after the road bridge, and so a turning basin would be needed a little further along the Savick Brook. The top three locks would be built as a three-rise staircase to lift the level of the navigation up to the level of the Lancaster Canal. [15] When first planned the locks were to be 72 feet (22 m) long, but this was reduced to 62 feet (19 m) to save costs. However, this decision resulted in British Waterways receiving a number of complaints, and the Inland Waterways Association pledged £45,000 towards the extra cost for the longer locks. The Waterways Trust agree to match any funding provided by the Inland Waterways Association, and so the longer locks were reinstated at an additional cost of around £90,000. [19] Because of the tidal nature of the lower Savick Brook, it was decided at the early stages of planning that the link would be designed for one way operation. [16]

Much of the early engineering design work was carried out by the Babtie group, who had opened offices in Preston in the 1990s. [20] The contract for the construction was awarded to the civil engineers Gleeson in November 2000, with Arup Water responsible for the detailed design. A partnership between British Waterways, Lancashire County Council, the Ribble Link Trust and The Waterways Trust were responsible for the management of the scheme. [5] A separate company, The Ribble Link Construction and Operation Limited, was set up as a joint venture between the Ribble Link Trust and Lancashire County Council. Such a company was a requirement of the Millennium Commission, in order for them to release funds for the project. [21] The Waterways Trust would be the owners of the new navigation, which would be built by Gleeson, with British Waterways acting as project managers. On completion, the navigation would be leased to British Waterways, who would then maintain it for 125 years. [22] Just prior to work starting, the Ribble Link Construction and Operation company was handed over to the Waterways Trust, and all the original directors resigned. The Ribble Link Trust expressed disappointment at this, as they would no longer have any say in how the link was managed, despite having raised a lot of the funding for it, and been involved in its promotion for over 20 years. [23]

Construction

Ground clearance began in February [24] and March 2001, [25] with the intention of constructing the lower end of the navigation first, but an outbreak of foot-and-mouth disease in March resulted in the surrounding agricultural land being closed for access. The middle of the route was not affected by access restrictions, and work began at lock 5 in May 2001. [26] Once the piling was completed, the contractors moved on to lock 4. Both locks were built on dry ground between the neck of a meander. The design involved driving four rows of interlocking steel piles into the ground, using a vibrating pile driver to minimise the noise nuisance associated with such work. [27] The inner two rows would form the lock walls, while the outer two were tied to them by steel rods to provide anchorage. Earth was then excavated from between the inner pair to form the lock chamber. [28] Construction of the staircase locks 1, 2 and 3 began soon afterwards. The foot-and-mouth restrictions were lifted in July 2001, and work on the lower section then began. [5]

Flood1.jpeg
Flood2.jpeg
Flood3.jpeg
Floating debris.jpeg
The Ribble Link acts as a storm drain for northwest Preston and is often in flood. This prevents boat traffic, restricting the number of days that it can be used each year.

While the locks were being constructed, the channel was widened, and in some places sharp bends were eased to ensure that boats could negotiate the turns. [29] Lock 6 had to be built on the line of the Brook, and so a bywash was created, to enable the brook to continue to flow while the work was carried out. [30] Lock 7 was built close to a new footbridge which had been built by the Waterway Recovery Group some years previously. [31] The most difficult lock to build was Lock 8, as the site was affected by tides, which flooded the works of several occasions. Spoil removed from the lock site and the adjacent channel was spread on land nearby, whereas spoil from most of the excavations was removed by lorry to wasteland close to Preston Docks. [32] Upstream of the lock, a farm bridge was replaced with a new structure, imported from Italy. The corrugated steel panels were bolted together and the structure was then craned into position. [33] Prolonged heavy rain in late August resulted in extensive flooding, causing significant damage to the newly built banks, which were washed into the channel. A second flood occurred in mid-September, and a third on 8 October, all of which resulted in work having to be re-done. [5]

The lock gates were built at the Northwich works of British Waterways, and were installed by engineers from British Waterways. [33] Lock 9 consists of a single rotating gate, which is raised to retain water at a suitable level for navigation, and lowered into the bed of the canal to allow boats to pass when the level of the incoming tide reaches the level in the pound above the structure. In order to construct it, piling was used to create a coffer dam around the site. Once the concrete base had been poured, the gate was lowered into place. [34] Near the top of the navigation, a footpath had once passed beneath the railway line, but the tunnel had been closed when the Tom Benson road was built. In order to reconnect the path, a steel walkway was attached to the side of the railway arch through which boats pass, for which permission had to be obtained from British Rail. [35]

The's'bends.jpeg
Lock5construct.jpeg
Lock6underconstruct.jpeg
Golf Club bridge.jpeg
Construction – tight 'sbends', locks under construction and the pre-fabricated bridge waiting to be lowered into position

The bridge to carry the Lancaster Canal towpath over the connection basin entrance at the top of the canal arrived on site from the Netherlands on 26 March, but the delivery lorry could not get close enough to the site, and so it was not fitted until 3 April. Further flooding of the lower section occurred on 29 April as a result of heavy rain and a high spring tide, again resulting in significant damage to the works. [5]

The coffer dam around the rotating sector gate was removed in June 2002, and in the same month, a British Waterways maintenance boat became the first vessel to use the waterway, when it moved from the Lancaster Canal into the connection basin above the staircase locks. A number of boats traversed the navigation in July 2002, in order to assist with the commissioning of the locks and to prove the methods of working. The boats were all owned by members of the Ribble Link Trust, who made their way from Preston Docks to the Lancaster Canal. Problems with the hydraulic swing bridge at the exit from the docks resulted in the boats leaving two hours later than expected, but a very high tide ensured that all the boats managed to pass through the sector gate before water levels dropped. [5] The official opening took place on 20 September 2002, when Margaret Beckett, the Secretary of State for the Environment, Food and Rural Affairs, declared the navigation open. [36]

Costs and funding

The Millennium Ribble Link was built to celebrate the new Millennium, and the final cost was £6.54 million, nearly twice the original estimate. [37] The Millennium Commission offered £2.7 million towards the project, [38] and they eventually contributed just over £3 million. [39] The remaining £3.54 million was provided by amounts from 34 other organisations, including British Nuclear Fuels, British Waterways, operators of five landfill sites as part of the Landfill Tax Credit Scheme, The Waterways Trust, and The Ribble Link Trust. [40] Costs escalated during the design phase, with an objection on environmental grounds from the Environment Agency, made on the day of the initial planning application, costing some £750,000 to resolve, and delaying the project by many months. [41]

Dredging1.jpeg
Dredging2.jpeg
Dredging3.jpeg
Dredging4.jpeg
Annual dredging of the Ribble Link takes place in March/April at the start of the bird breeding season.

Originally £850,000 was set aside, primarily from Lancashire Waste Services Limited landfill tax credits for 125 years of maintenance. All of The Waterways Trust maintenance budget was used to fund the original over-spend and the period of maintenance reduced to 40 years.

British Waterways have spent over £2.1million on maintenance and keeping the navigation open in the first five years of operation. The Annual Report and Accounts of The Waterways Trust show a maintenance expenditure on the Ribble Link of £22,200 in 2005/6 from an income of £3,186,521 and £29,000 in 2006/7 from an income of £4,235,471. [42]

Since it was opened, the Ribble Link had been expensive to maintain. It suffered from flooding during the winter of 2003–2004, resulting in a lot of material being depositied in the channel, and scouring of some of the bywash weirs. The link was closed and Land and Water were employed to carry out dredging in March 2004. This was hampered by low water levels due to damage to the bywash weirs and by water supplies being limited by other work taking place on the Lancaster Canal. The whole of the link needed to be dredged, and further flooding took place while the work was in progress. The cost of the operation was £124,576. [43] The link was closed again during 2006, after voids appeared behind some of the lock structures. The work to fill the voids and to repair a lock bywash cost £360,000. Further dredging was required and cost £240,000. Some of this was achieved by conventional bucket dredging, where the material was removed and taken to landfill, but the use of 'cutter section' dredging was also trialled, after a licence was obtained from the Department for Environment, Food and Rural Affairs (DEFRA). This involved pumping the silt over the sea lock gate when the tide was going out so that it was carried into the Ribble, and following completion of the work, the link was re-opened on 6 April 2007. The effectiveness of cutter section dredging resulted in British Waterways applying for annual licences for the process. Sludge is brought into the lower section of the link by incoming tides, [44] and is a known problem on the Ribble. The cost of dredging to maintain the route to Preston Docks was one of the main reasons why they were closed in October 1981. [45]

Operation

British Waterways staff are often at hand to assist a passage. 3menandapump.jpeg
British Waterways staff are often at hand to assist a passage.

The Millennium Ribble Link follows a course to the north and west of the city of Preston along a canalisation of the Savick Brook, which is tidal along its lower reaches. The channel has been straightened and widened to allow navigation by boats with a maximum beam of 10.5 feet (3.2 m). One bank of the brook has been left with reed edges, to minimise the disturbance to wildlife, and artificial sand cliffs have been established where those used by nesting sand martins had to be removed as part of the engineering works. In addition to use by boats, a primary aim of the project was to create a resource which could be enjoyed and used by walkers, cyclists and anglers. There are footpaths along its banks for most of its length, and the arts trail was part of the vision to make exploring it more interesting. [46]

The rotating sector gate just before the canal joins the Ribble Ribble Link 04c216.jpg
The rotating sector gate just before the canal joins the Ribble

The link, which is around 4 miles (6.4 km) long from the junction with the Ribble to the junction with the Lancaster Canal, is normally only open in the summer months between April and mid-October. However, its use is restricted by the times of tides and by wind and weather conditions, and it is therefore only accessible for a limited number of days during this period. All boats wanting to use the link must pre-book a passage, by contacting the Canal and River Trust in advance. It is only operated in one direction on any one day. The sea lock at the Ribble end and the triple staircase at the Lancaster Canal end are manned by Canal and River Trust staff, whereas the rest of the locks are unmanned and are operated by boat crews. [47] In 2022, passages could be booked on 71 days during the open season, and the number of boats that could be accommodated was restricted to four rather than six on two days when the height of the tide was at the minimum at which the link can be accessed. Generally, the direction of travel was the same for three of four days, and was then reversed for the next three or four days. [48]

While the Ribble Link officially refers to the canalised Savick Brook, it has also come to mean the entire passage from the upgraded facilities at Tarleton on the Rufford Arm of the Leeds and Liverpool Canal, travelling down 4 miles (6.4 km) of the River Douglas to the Ribble, the journey for 3.5 miles (5.6 km) up the River Ribble, and the new link to the Lancaster Canal. The entrance to the Savick Brook is controlled by a green light, signifying that it is safe to proceed along the link to the rotating sea lock. Boats may have to wait until tide levels are correct for the gate to be opened, and once through the gate it will be closed to retain water in the channel as the tide drops. There is a pontoon upstream of the gate where boats may have to wait again until water levels beneath Savick Bridge fall sufficiently to allow passage beneath it. [46] The Canal and River Trust will only accept bookings for days when the tide is between 28 and 31 feet (8.6 and 9.6 m), when wind speeds are below 4 or 5 on the Beaufort scale and when visibility is good. [49]

When first opened, there was a charge for using the Ribble Link, but in February 2003, British Waterways announced that all charges for using the link and for other structures including the Anderton Boat Lift, the Falkirk Wheel and Standedge Canal Tunnel would be funded from licence fees. [50] There is thus no charge to use the link for boats with a full Canal and River Trust licence. Pleasure craft on hire are charged £60 per passage (each way). A Skippers Guide is published by the Canal and River Trust and is normally available on their web site. Because the Ribble is tidal, boats making the crossing are required to carry extra safety equipment, over and above that which is necessary for cruising on inland waterways. [51]

Crossing the Ribble involves navigating on tidal waters, and is inevitably a little more difficult than navigating an inland waterway. There is a relatively small window when tide levels are correct to use the sea lock at the start of the link, and this dictates the times that boats are allowed through the lock at Tarleton for the start of the journey. A maximum of six boats are allowed to make the journey on any one tide, but that normally ensures that boats can travel in convoy. The journey down the River Douglas is against the incoming tide, and engines will be required to work hard for up to four hours. If this results in the engine overheating, boaters are advised to run some hot water, to help cool it down. Most crossings are completed without incident, but slower boats or those making the crossing on a neap tide may arrive at the Savick Brook when there is insufficient water to use the sea lock, and may be diverted to Preston Docks, 1.5 miles (2.4 km) further up the Ribble. [52] Although most boats make the journey successfully, there has been an increase in callouts to the emergency services to aid boats that have got into difficulty. The Royal National Lifeboat Institute (RNLI) station at Lytham St Annes received five callouts in a two-month period in 2009. When a boat has become stuck on a mudbank, the normal course of action is to wait 12 hours until the next tide, when it can be refloated, but this often involves the RNLI returning late at night or early in the morning, to help the boat get to Preston Docks. [53]

The Ribble Link Operation and Maintenance company continued to own the navigation, with British Waterways operating it on their behalf. However, in October 2011, the government announced the proposal to replace British Waterways with a charitable trust, the Canal and River Trust. Since the objectives of both trusts were similar, talks took place between them, and a decision to merge them was made. The takeover took place on 26 July 2012, and since then, the Canal and River Trust has been responsible for all aspects of the link. [54] The Canal and River Trust state that boat sizes are restricted to 62 feet (19 m) long and 10.5 feet (3.2 m) wide. The length is not based on the size of the locks, which are 72 feet (22 m) long, but the difficulty of navigating some of the bends in a longer boat, in view of the restricted channel width. Most vessels that use the Ribble Link travel along the Rufford Branch of the Leeds and Liverpool Canal, and the locks on that section can only accommodate 62-foot (19 m) boats. [55]

Course

Ribble Link
BSicon uexCONTg.svg
Savick Brook
BSicon uexCONTg.svg
BSicon uexSTR.svg
Sharoe Brook
BSicon uCONTgq.svg
BSicon uFABZq+lr.svg
BSicon uxKRZu.svg
BSicon uxKRZu.svg
BSicon uCONTfq.svg
Lancaster Canal
BSicon uSKRZ-Eu.svg
BSicon uexSTRl.svg
BSicon uexABZg+r.svg
Towpath bridge
BSicon uddSTRr.svg
BSicon uddSTRr.svg
Connection and Turning Basins
BSicon uSTRl.svg
BSicon uSTAIRl.svg
BSicon uABZgr.svg
1-3
Staircase Locks
BSicon uSKRZ-Yu.svg
B6241 road
BSicon CONTgq.svg
BSicon umKRZu.svg
BSicon CONTfq.svg
Preston - Blackpool Railway
BSicon uSTR+l.svg
BSicon uSTRr.svg
BSicon uLock5.svg
4
Lock
BSicon uSKRZ-Eu.svg
Savick Way bridge
BSicon uLock5.svg
5
Lock
BSicon uSKRZ-Yu.svg
Leyland Bridge, Lea Road
BSicon uexCONTgq.svg
BSicon ueABZg+r.svg
Lady Head Runnel
BSicon uLock5.svg
6
Lock
BSicon uSKRZ-Eu.svg
Tudor Avenue bridge
BSicon uSKRZ-Eu.svg
Footbridge
BSicon uLock5.svg
7
Lock
BSicon uSKRZ-Eu.svg
Goodier Footbridge
BSicon uddSTRr.svg
Holding Basin
BSicon uLock5.svg
8
Lock
BSicon uexCONTgq.svg
BSicon ueABZg+r.svg
Deepdale Brook
BSicon uSKRZ-Au.svg
A583 road, Savick Bridge
BSicon uFGATEu.svg
9
Rotating sealock
BSicon uSTR.svg
Savick Brook (tidal)
BSicon uCONTgq.svg
BSicon uFABZq+lr.svg
BSicon uFABZqlr.svg
BSicon uCONTfq.svg
River Ribble
BSicon ueABZgl.svg
BSicon uexSTR+r.svg
BSicon uLock3.svg
BSicon uexSTR.svg
River Lock
BSicon uSTR.svg
BSicon uexSTRl.svg
BSicon uexCONTfq.svg
River Douglas
BSicon uCONTf.svg
--

The Millennium Ribble Link was Great Britain's first inland waterway to be constructed in nearly 100 years when it was opened in July 2002, and was the first to be built for leisure purposes only, rather than for commercial use. Use of the link is restricted, as it is only open between April and mid-October, and the direction of travel changes on alternate days. The 4-mile (6.4 km) link connects the once-isolated Lancaster Canal to the River Ribble, from where it is possible to reach the main navigable system via the River Douglas and the Leeds and Liverpool Canal's Rufford Branch. Use of the Ribble is subject to tides and weather conditions. [56] The Millennium Commission requested that the link should include an art trail, and five works of art were installed. The top four were produced by the sculptor Thompson Dagnall, and were collectively known as Gauging the Ripple. A fifth one, also produced by Dagnall, was located near the bottom of the link. [57] Because the link was partly funded by the Millennium Commission, they were keen that it should include features that would benefit the wider community, rather than just boaters, and so it was marketed as a linear water park, with cycle routes, footpaths, leisure areas and the arts trail, all of which were designed to attract visitors to the facility, and generate economic returns for the local community. [39] Footpaths run from the Lancaster Canal along the Ribble Link as far as Goodier Bridge, just short of Lock 8. [58]

The Fire Sculpture adjacent to Lock 4 is part of the Ribble Link Sculpture trail, by the artist Thompson Dagnall Fire by Dagnall.jpeg
The Fire Sculpture adjacent to Lock 4 is part of the Ribble Link Sculpture trail, by the artist Thompson Dagnall

The junction with the Lancaster Canal is 1.4 miles (2.3 km) from the Preston end of the canal. [59] Boats accessing the link pass under a towpath bridge to enter a holding basin. This leads to a three-lock staircase, which is operated by Canal and River Trust staff, and so boaters must wait in the basin until instructed to proceed. The top lock is overlooked by the first of five sculptures that form the sculpture trail. It was originally a giant wooden statue of a man, representing 'Water', but this was removed in 2008 when the wood decayed. [60] In 2014 it was replaced by a steel sculpture produced by the sculptor Denis O’Connor of Derby. It consists of a stainless steel canal boat, with the tools used to construct canals in the 19th century, on top of a corten steel column. [61] At the bottom of the staircase there is another basin, which boats use to turn around ready for the descent of the next locks. The Savick Brook enters the basin from the east, and the link continues to the west following the original line of the Savick Brook. [58] To reach the basin, the brook has passed through an aqueduct carrying the Lancaster Canal, which was constructed in 1797 by John Rennie, [62] and then flowed through the grade II listed Haslem Park. This was opened in 1910, and was a gift to the people of Preston by Mary Haslem, in memory of her father John, who owned a local cotton mill. She was particularly keen that the park should cater for the needs of children. The park includes a lake fed by water from the Lancaster Canal. [63]

The link passes under the B6241 Tom Benson Way, immediately followed by a bridge carrying the Blackpool South branch line from Preston to Salwick, before it reaches the first of the boater-operated locks. Surplus water bypasses Lock 4 via a weir and a meander to the north of the site. [58] The sculpture 'Fire' by Dagnall, a large block of stone polished with graphite to make it look like coal and engraved with a fossilised fern on the top, is close to the lock. [64] The link is crossed by Savick Way before it reaches Lock 5, where the weir and meander are similar in layout to that at Lock 4. To the north of this section is a quiet public park, while to the south is the 'hay meadow', part of the Ribble Link Development, identified as being of 'national significance'. Public access is approved and welcomed. The third of Dagnall's sculptures representing 'Air', consisting of two interlocking tree trunks straddling the towpath was close to Lock 5 but was removed in 2009. [64]

In 2009, 7 years after opening British Waterways began providing public access to the Hay Meadow for public appreciation Ribble Link Hay Meadow.jpeg
In 2009, 7 years after opening British Waterways began providing public access to the Hay Meadow for public appreciation

The Ribble Link continues under Leyland Bridge, which carries Lea Road, and then enters a flood plain, with housing to the south and agricultural fields to the north. A small stream called Lady Head Runnel flows southwards to join the brook. Beyond this is Lock 6 and its weir, where a sculpture representing 'Earth' consists of reclaimed gritstone slabs set into the towpath, with large footprints carved into them. The footprints are two and a half time life size, to represent those of the man at Lock 1. [64] Tudor Avenue bridge provides access to New House Farm and the Ashton and Lea Golf Club, both of which are on the north bank of the brook. A footbridge carries a public footpath over the brook before it reaches Lock 7 with its weir, again feeding surplus water around the north side of the structure. A cycle path runs along the south bank of the brook until another footpath crosses at Goodier Bridge. Just before Lock 8 is a holding basin, where floating pontoons are available for mooring, until permission to proceed down the tidal section below the lock and to use the sea lock is given.

There is a pumping station on the left bank operated by British Nuclear Fuels, [17] followed by a copse of semi-ancient woodland and a Biological Heritage Site reedbed at Savick Bridge, which carries the main A583 road. The wooden sculpture 'Rook' by Thompson Dagnall is located on the north bank, and can also be seen from the A583 road. [65] Deepdale Brook joins on the right bank, and the river is crossed by the A583 road. The sea lock is a short distance below the bridge, and the brook continues to the west of Lea Marsh, until it reaches the River Ribble. Preston Docks marina is upstream from the junction, on the north bank of the Ribble, and the River Douglas, which provides the route to the Rufford branch of the Leeds and Liverpool Canal is downstream, on the south bank. [58]

Background

Ribble Link Lock 5 Bursts bank.jpeg
Ribble Link Lock5 floods.jpeg
Flooding at Lock 4 in January 2008, when Savick Brook burst its bank and overflowed the lock

The River Ribble and the Savick Brook Ribble Link are subject to outfall from a number of sources, including the Springfields nuclear fuel production facility at Salwick, to the north of Savick Bridge. A research project by the University of Portsmouth was carried out to test low cost tools for measuring water quality, with one of the pilot studies carried out on the Ribble. This was known to have failed to meet Environmental Quality Standards, due to the presence of heavy metals, organic compounds and organo-metallic compounds. The Environment Agency take samples from the estuary once a month to monitor the water quality, but the research project took samples from many more monitoring points including on the Ribble Link. [66] Research carried out in 2006 looked at the effects of radioactive discharges from the Springfields site on those working, living or finding recreation in the locality. The site produced fuel for Magnox reactors, pressurised water reactors and advanced gas-cooled reactors at the time of the survey, although the production of Maxnox fuel ceased in 2007. Radionuclides are discharged to the air and in liquids into the environment, with levels of radionuclides dropping significantly since Maxnox fuel production stopped. At the time the site was owned by the Nuclear Decommissioning Authority, and operated by Springfield Fuels Ltd Westinghouse. [67] The Ribble Link between the sea lock and lock 8 was studied as part of the aquatic survey. [68] Sediments dredged from this section during construction were used to landscape the north-west bank of the brook, and these were tested for beta emissions. [69] The report recommended that testing for beta and gamma dose rates could be introduced on the section of the Ribble Link below the sea lock, where beta dose rates were found to be relatively high. [70]

The Banded Demoiselle, one of the largest and most colourful of the damselflies, has long been known from the Cuerden Valley Park. For many years this was thought to be its only Lancashire locality. However, during the late 1990s a considerable expansion of its range took place. The insect reached the Savick Brook, west of Preston, in 1997 and, by 1999, was well established there. In 1998, it was recorded on the Lancaster Canal north of Preston and also on the Leeds and Liverpool Canal at Withnell Fold. [71]

See also

Bibliography

Related Research Articles

<span class="mw-page-title-main">Grand Union Canal</span> Canal in England

The Grand Union Canal in England is part of the British canal system. It is the principal navigable waterway between London and the Midlands. Starting in London, one arm runs to Leicester and another ends in Birmingham, with the latter stretching for 137 miles (220 km) with 166 locks from London. The Birmingham line has a number of short branches to places including Slough, Aylesbury, Wendover, and Northampton. The Leicester line has two short arms of its own, to Market Harborough and Welford.

<span class="mw-page-title-main">Lancaster Canal</span> Canal in Northwest England

The Lancaster Canal is a canal in North West England, originally planned to run from Westhoughton in Lancashire to Kendal in south Cumbria. The section around the crossing of the River Ribble was never completed, and much of the southern end leased to the Leeds and Liverpool Canal, of which it is now generally considered part.

<span class="mw-page-title-main">North Walsham & Dilham Canal</span> Waterway in the English county of Norfolk

The North Walsham and Dilham Canal is a waterway in the English county of Norfolk. It was authorised by Parliament in 1812, but work on the construction of a canal which ran parallel to a branch of the River Ant did not start until 1825. It included six locks, which were sized to accommodate wherries, and was officially opened in August 1826. It was 8.7 miles (14.0 km) long and ran from two bone mills at Antingham to a junction with the River Ant at Smallburgh. It carried offal for the bone mills and agricultural products, as it proved cheaper to land coal on the beach at Mundesley and cart it overland than to use the canal.

<span class="mw-page-title-main">Calder and Hebble Navigation</span> Inland waterway in West Yorkshire, England

The Calder and Hebble Navigation is a broad inland waterway, with locks and bridgeholes that are suitable for 14-foot-wide (4.3 m) boats, in West Yorkshire, England. Construction to improve the River Calder and the River Hebble began in 1759, and the initial scheme, which included 5.7 miles (9.2 km) of new cuts, was completed in 1770 and has remained navigable since it was opened. Significant improvements were made, including the Salterhebble branch to Halifax, opened in 1828, and ever-longer cuts to bypass river sections. Trade was assisted by the opening of the Rochdale Canal in 1804, which provided a through route from Sowerby Bridge to Manchester. There were plans to abandon the river sections completely in the 1830s, but these were modified as the needs of mill owners and other riparian landowners were recognised.

<span class="mw-page-title-main">River Great Ouse</span> River in England

The River Great Ouse is a river in England, the longest of several British rivers called "Ouse". From Syresham in Northamptonshire, the Great Ouse flows through Buckinghamshire, Bedfordshire, Cambridgeshire and Norfolk to drain into the Wash and the North Sea near Kings Lynn. Authorities disagree both on the river's source and its length with one quoting 160 mi (260 km) and another 143 mi (230 km). Mostly flowing north and east, it is the fifth longest river in the United Kingdom. The Great Ouse has been historically important for commercial navigation, and for draining the low-lying region through which it flows; its best-known tributary is the Cam, which runs through Cambridge. Its lower course passes through drained wetlands and fens and has been extensively modified, or channelised, to relieve flooding and provide a better route for barge traffic. The unmodified river would have changed course regularly after floods.

<span class="mw-page-title-main">Thames and Severn Canal</span> Canal in Gloucestershire in the south-west of England

The Thames and Severn Canal is a canal in Gloucestershire in the south-west of England, which was completed in 1789. It was conceived as part of a cargo route from Bristol and the Midlands to London, linking England's two largest rivers for better trade. The route climbs the steep Cotswold escarpment through the Golden Valley, tunnels underneath the summit of the Cotswold Edge, and emerges near the source of the Thames.

<span class="mw-page-title-main">Trent and Mersey Canal</span> Canal in England

The Trent and Mersey Canal is a 93+12-mile (150 km) canal in Derbyshire, Staffordshire and Cheshire in north-central England. It is a "narrow canal" for the vast majority of its length, but at the extremities to the east of Burton upon Trent and north of Middlewich, it is a wide canal.

<span class="mw-page-title-main">Bridgwater and Taunton Canal</span> Canal in south-west England

The Bridgwater and Taunton Canal is a canal in the south-west of England between Bridgwater and Taunton, opened in 1827 and linking the River Tone to the River Parrett. There were a number of abortive schemes to link the Bristol Channel to the English Channel by waterway in the 18th and early 19th centuries. These schemes followed the approximate route eventually taken by the Bridgwater and Taunton Canal, but the canal was instead built as part of a plan to link Bristol to Taunton by waterway.

<span class="mw-page-title-main">River Weaver</span> River in Cheshire, England

The River Weaver is a river, navigable in its lower reaches, running in a curving route anti-clockwise across west Cheshire, northern England. Improvements to the river to make it navigable were authorised in 1720 and the work, which included eleven locks, was completed in 1732. An unusual clause in the enabling Act of Parliament stipulated that profits should be given to the County of Cheshire for the improvement of roads and bridges, but the navigation was not initially profitable, and it was 1775 before the first payments were made. Trade continued to rise, and by 1845, over £500,000 had been given to the county.

<span class="mw-page-title-main">Sankey Canal</span> Canal in England

The Sankey Canal in North West England, initially known as the Sankey Brook Navigation and later the St Helens Canal, is a former industrial canal, which when opened in 1757 was England's first of the Industrial revolution, and the first modern canal.

<span class="mw-page-title-main">River Ribble</span> River in North Yorkshire and Lancashire, England

The River Ribble runs through North Yorkshire and Lancashire in Northern England. It starts close to the Ribblehead Viaduct in North Yorkshire, and is one of the few that start in the Yorkshire Dales and flow westwards towards the Irish Sea.

<span class="mw-page-title-main">Canals of the United Kingdom</span> Network of inland waterways

The canals of the United Kingdom are a major part of the network of inland waterways in the United Kingdom. They have a varied history, from use for irrigation and transport, through becoming the focus of the Industrial Revolution, to today's role of recreational boating. Despite a period of abandonment, today the canal system in the United Kingdom is again increasing in use, with abandoned and derelict canals being reopened, and the construction of some new routes. Canals in England and Wales are maintained by navigation authorities. The biggest navigation authorities are the Canal & River Trust and the Environment Agency, but other canals are managed by companies, local authorities or charitable trusts.

<span class="mw-page-title-main">Driffield Navigation</span> Waterway in Yorkshire, England

The Driffield Navigation is an 11-mile (18-kilometre) waterway, through the heart of the Holderness Plain to the market town of Driffield, East Riding of Yorkshire, England. The northern section of it is a canal, and the southern section is part of the River Hull. Construction was authorised in 1767, and it was fully open in 1770. Early use of the navigation was hampered by a small bridge at Hull Bridge, which was maintained by Beverley Corporation. After protracted negotiation, it was finally replaced in 1804, and a new lock was built to improve water levels at the same time. One curious feature of the new works were that they were managed quite separately for many years, with the original navigation called the Old Navigation, and the new works called the New Navigation. They were not fully amalgamated until 1888.

<span class="mw-page-title-main">Swansea Canal</span>

The Swansea Canal was a canal constructed by the Swansea Canal Navigation Company between 1794 and 1798, running for 16.5 miles (26.6 km) from Swansea to Hen Neuadd, Abercraf in South Wales. It was steeply graded, and 36 locks were needed to enable it to rise 373 feet (114 m) over its length. The main cargos were coal, iron and steel, and the enterprise was profitable.

<span class="mw-page-title-main">Douglas Navigation</span>

The Douglas Navigation was a canalised section of the River Douglas or Asland, in Lancashire, England, running from its confluence with the River Ribble to Wigan. It was authorised in 1720, and some work was carried out, but the undertakers lost most of the share money speculating on the South Sea Bubble. Alexander Leigh attempted to revive it eleven years later, and opened it progressively between 1738 and 1742. Leigh began work on a parallel canal called Leigh's Cut to improve the passage from Newburgh to Gathurst, but progress was slow and it was unfinished in 1771.

<span class="mw-page-title-main">Stroudwater Navigation</span> Canal in Gloucestershire, England

The Stroudwater Navigation is a canal in Gloucestershire, England which linked Stroud to the River Severn. It was authorised in 1776, although part had already been built, as the proprietors believed that an Act of Parliament obtained in 1730 gave them the necessary powers. Opened in 1779, it was a commercial success, its main cargo being coal. It was 8 miles (13 km) in length and had a rise of 102 ft 5 in (31.22 m) through 12 locks. Following the opening of the Thames and Severn Canal in 1789, it formed part of a through route from Bristol to London, although much of its trade vanished when the Kennet and Avon Canal provided a more direct route in 1810. Despite competition from the railways, the canal continued to pay dividends to shareholders until 1922, and was not finally abandoned until 1954.

<span class="mw-page-title-main">North Pennine Ring</span>

The North Pennine Ring is a canal ring which crosses the Pennines between Manchester, Leeds and Castleford. It follows parts of five canals, and shares much of its route with the Outer Pennine Ring, which uses a different route for the southern crossing of the Pennines.

<span class="mw-page-title-main">Carpenter's Road Lock</span>

Carpenter's Road Lock is a rising radial lock in the London Borough of Newham, near Marshgate Lane in Stratford, England. It is located on the Bow Back Rivers and was constructed in 1933/34. It is the only lock in Britain with rising radial gates at both ends. British Waterways were hoping to restore it as part of the upgrade to Bow Back Rivers which took place for the 2012 Summer Olympics, but the gantries which enabled the gates to be raised were demolished to accommodate a wide bridge giving access to the main stadium. After the Games, most of the overbridge was removed. Funding for the restoration of the lock was in place by early 2016, and it is expected to be brought back into use in 2017.

The Ribble Link Trust is a waterway society, campaigners, instigators of and involved in the Ribble Link, a navigable waterway that connects the Lancaster Canal to the Leeds and Liverpool Canal in Lancashire, England, via the River Ribble.

Savick Brook is a watercourse in Lancashire, England, which runs from the outskirts of Longridge westward north of Preston to the River Ribble.

References

  1. Hadfield & Biddle 1970, p. 183.
  2. Hadfield & Biddle 1970, pp. 187–188.
  3. Hadfield & Biddle 1970, p. 190.
  4. Phillips 2022.
  5. 1 2 3 4 5 6 The Millenium Ribble Link, (2002), DVD, www.videoactive.co.uk
  6. "Introduction and historical background". Ribble Link Trust. 22 October 2001. Archived from the original on 7 September 2022.
  7. Squires 2008, p. 112.
  8. 1 2 "Formation and Purpose". Ribble Link Trust. 22 October 2001. Archived from the original on 7 September 2022.
  9. Squires 2008, pp. 130–131.
  10. Coxah 2001, p. 3.
  11. Oldfield & Charlesworth 2002, p. 5.
  12. Oldfield & Charlesworth 2002, p. 7.
  13. Oldfield & Charlesworth 2002, p. 8.
  14. Oldfield & Charlesworth 2002, p. 12.
  15. 1 2 3 "Proposals". Ribble Link Trust. 24 April 2002. Archived from the original on 7 September 2022.
  16. 1 2 Fazackerley 1999.
  17. 1 2 Clegg 2003, Item 19 June 2002.
  18. Clegg 1999.
  19. Fazackerley 2001.
  20. Fazackerley 2018, p. 37.
  21. Fazackerley 1998.
  22. Clegg 2001, Item 28 April 2000.
  23. Fazackerley 2000.
  24. Clegg 2001, Item 8 February 2001.
  25. Clegg 2001, Item 4 March 2001.
  26. Clegg 2001, Item 10 May 2001.
  27. Fazackerley 2018, pp. 57, 59.
  28. Clegg 2001, Item 26 June 2001.
  29. Fazackerley 2018, pp. 57, 61.
  30. Fazackerley 2018, pp. 59–60.
  31. Fazackerley 2018, p. 61.
  32. Fazackerley 2018, p. 63.
  33. 1 2 Fazackerley 2018, pp. 63–65.
  34. Fazackerley 2018, p. 73.
  35. Fazackerley 2018, pp. 71–72.
  36. Fazackerley 2018, p. 89.
  37. Barnett 2020, p. 56.
  38. Fazackerley 2018, p. 44.
  39. 1 2 "The Millennium Ribble Link". Millennium Commission. 2003. Archived from the original on 16 June 2011.
  40. Fazackerley 2018, pp. 42–46.
  41. Fazackerley 2018, pp. 40–41.
  42. "Register Home Page". Archived from the original on 5 February 2009. Retrieved 20 April 2016.
  43. "Maintenance dredging of the Millennium Ribble link" (PDF). Land and Water. Archived from the original (PDF) on 17 July 2011. Retrieved 8 November 2009.
  44. "Ribble Link dredging on target". Waterscape.com. 22 October 2008. Archived from the original on 6 March 2012.
  45. "Port of Preston - History to 1981" (PDF). Preston Docks. Archived from the original (PDF) on 3 March 2016. Retrieved 5 November 2009.
  46. 1 2 Cumberlidge 2009, p. 252.
  47. Cumberlidge 2009, p. 253.
  48. "Ribble Link Passage Schedule 2022" (PDF). Canal and River Trust. 2022. Archived (PDF) from the original on 7 January 2022.
  49. CRT 2016, Sect 2.5.
  50. Clegg 2003, Item 7 February 2003.
  51. CRT 2016, Sect 4.1.
  52. Butler 2009, pp. 74–75.
  53. Whalley 2009, p. 84.
  54. "Full accounts made up to 31 March 2012". Companies House. 12 December 2012. p. 1.
  55. "Waterway Dimensions" (PDF). Canal and River Trust. 2022. p. 15. Archived (PDF) from the original on 20 September 2022.
  56. Cumberlidge 2009, pp. 252–253.
  57. Fazackerley 2018, pp. 32–34.
  58. 1 2 3 4 Ordnance Survey, 1:2500 map
  59. Cumberlidge 2009, p. 166.
  60. Fazackerley 2018, p. 32.
  61. Denny 2022, p. 83.
  62. Historic England. "Canal aqueduct, numbered 13 (1292153)". National Heritage List for England .
  63. Historic England. "Haslem Park (1001458)". National Heritage List for England .
  64. 1 2 3 "Proposal For Public Art". Ribble Link Trust. 23 January 2003. Archived from the original on 7 September 2022.
  65. Fazackerley 2018, p. 34.
  66. Allan 2005.
  67. Tipple 2007, p. 7.
  68. Tipple 2007, p. 25.
  69. Tipple 2007, p. 28.
  70. Tipple 2007, p. 69.
  71. "Dragonflies". Lacfs.org.uk. 1 January 2004. Archived from the original on 15 March 2016. Retrieved 20 April 2016.

53°45′55.19″N2°47′19.49″W / 53.7653306°N 2.7887472°W / 53.7653306; -2.7887472