Bakersfield station (California High-Speed Rail)

Last updated

Bakersfield
General information
Location Golden State Avenue
Bakersfield, California
Coordinates 35°23′26″N119°01′20″W / 35.390655°N 119.022328°W / 35.390655; -119.022328
Owned by California High-Speed Rail Authority
History
Opening2030;6 years' time (2030)
Services
Preceding station California High Speed Rail.svg California High-Speed Rail Following station
Kings–Tulare
towards Merced
Phase I
Central Valley Segment
Terminus
Kings–Tulare Phase I
(2033)
Palmdale
towards Anaheim
Location
Bakersfield station (California High-Speed Rail)

Bakersfield station is a proposed California High-Speed Rail station in Bakersfield, California. The station is part of the initial construction segment.

Contents

History

The initial 2005 environmental impact report for the system considered two general alignments for the Fresno to Bakersfield segment: one following the BNSF Railway right-of-way down the center of the Central Valley, and another following the Union Pacific Railroad right-of-way farther to the east. The BNSF alignment was chosen because it avoided urban areas, making it less expensive and having fewer constructibility concerns. The preferred Bakersfield station option co-located it with the existing Bakersfield station at Truxtun Avenue due to its central location and connectivity with existing transportation. [1] The city of Bakersfield had endorsed the Truxtun Avenue station location in 2003, but reversed its position in 2011 to oppose the High-Speed Rail project [2] due to concerns on the impact to new facilities and revitalization to the downtown area that had occurred in the interim. [3]

The environmental impact report for the Fresno to Bakersfield segment was approved in May 2014 by the California High-Speed Rail Authority, [4] preserving the BNSF Railway alignment and Truxtun Avenue station location. Construction of this alignment would have impacted 526 structures, including 231 residences. [5] The city of Bakersfield filed a lawsuit in June 2014 opposing this alignment. The lawsuit was settled in December 2014 with an agreement to instead adopt a "locally generated alignment" that uses the alignment of the slightly-farther-north Union Pacific Railroad, stopping at a new station near the intersection of F Street and Golden State Avenue. [4] The new alignment is 1.3 miles (2.1 km) shorter, and its construction would be much less disruptive, impacting only 150 buildings, almost all of which are non-residential. [5]

This change, along with an ongoing lawsuit with the nearby city of Shafter, California, caused the southernmost 8 miles (13 km) of the Initial Construction Segment to be delayed and not included as part of the first package of construction bids. [6] A station planning agreement with the city was announced on September 15, 2015. [7]

In February 2016, the California High-Speed Rail Authority's draft business plan stated that the funding on hand would only allow construction of the segment from San Jose to just northwest of Shafter, raising the possibility that a temporary station might be built near Shafter, 23 miles north of Bakersfield, if additional funds could not be obtained. [8] [9] The April 2016 revisions to the plan cut back the initial construction segment to Wasco, 30 miles north of Bakersfield, given its better connectivity to existing transportation. [10] [11]

As of December 2019, an elevated station design was being planned for the Bakersfield station. [12]

Related Research Articles

<i>San Joaquins</i> Amtrak service in San Joaquin Valley, California

The San Joaquins is a passenger train service operated by Amtrak in California's San Joaquin Valley. Six daily round trips run between its southern terminus at Bakersfield and Stockton, with onward service to Sacramento and Oakland.

<span class="mw-page-title-main">California High-Speed Rail</span> Under-construction passenger rail system

California High-Speed Rail is a publicly funded high-speed rail system being developed in the U.S. state of California by the California High-Speed Rail Authority. It was authorized by a statewide ballot proposal called Proposition 1A. It is intended to reduce travel times in the state, particularly between the major urban areas of the north and the south. The system is also intended to reduce pollution and carbon emissions, ease highway and air traffic congestion, and boost the state's economy, particularly in the Central Valley region.

<span class="mw-page-title-main">91/Perris Valley Line</span> Metrolink commuter rail line linking Downtown Los Angeles to Riverside and Perris

The 91/Perris Valley Line, formerly known as the 91 Line, is a commuter rail route operated by Metrolink that runs from Los Angeles to Perris in Southern California, mostly paralleling State Route 91 between Riverside-Downtown and Buena Park stations. Operating since May 2002, the route runs on the Southern Transcon line owned by BNSF Railway, as well as the Riverside County Transportation Commission-owned San Jacinto Branch Line. Services are primarily operated along the entire route between L.A. Union Station and Perris–South, while some trips use Riverside–Downtown as a terminus.

<span class="mw-page-title-main">Regional Connector</span> Transit project in Los Angeles

The Regional Connector Transit Project constructed a 1.9-mile (3.1 km) light rail tunnel for the Los Angeles Metro Rail system in Downtown Los Angeles. It connected the A and E lines with the former L Line. The A and E lines previously both terminated at 7th Street/Metro Center station, coming from Long Beach and Santa Monica, respectively, while the L Line ran through Little Tokyo/Arts District to either Azusa or East Los Angeles. Now the A and E lines continue together through new stations at Grand Avenue Arts/Bunker Hill, Historic Broadway, and Little Tokyo/Arts District. From there, they diverge on the former L Line toward Azusa and East Los Angeles, respectively. The project provides a one-seat ride into the core of Downtown for passengers on those lines who previously needed to transfer, thus reducing or altogether eliminating many transfers of passengers traveling across the region via Downtown Los Angeles.

<span class="mw-page-title-main">Madera station (Amtrak)</span>

Madera station is an unstaffed train station near Madera, California, United States that is served by San Joaquins trains, which run between Oakland or Sacramento and Bakersfield, California.

Mill Creek is a linear park located in Bakersfield, California. It runs along the Kern Island Canal between Golden State Avenue and California Avenue in downtown, although there is a gap between 19th Street and the BNSF railroad yard. The center of the park is Central Park, the only park in downtown. The park contains a lake with spray fountains and the “Mill Creek” bridge. It is also home to the Bakersfield Museum of Art and the Bakersfield Community House.

<span class="mw-page-title-main">Transportation in Kern County, California</span>

Kern County’s transportation system was quoted as the “unseen industry.” Located at the southern end of the San Joaquin Valley, the county is at a prime location to ship goods west to the central coast, south to ports in Los Angeles, and east to corridors that connect to the rest of the country. It is also on major corridors that link to all northern points.

<span class="mw-page-title-main">Construction of California High-Speed Rail</span>

The construction of the California High-Speed Rail system is an undertaking by the California High-Speed Rail Authority. The project is expected to span about 800 miles (1,300 km) and will be completed in two phases:

<span class="mw-page-title-main">History of California High-Speed Rail</span>

The California High-Speed Rail Authority was established in 1996 after decades of advocacy for building a high speed rail system in California. The passage of Proposition 1A in 2008, followed by the awarding of federal stimulus funds in 2010, established the initial funding for the California High-Speed Rail system. Construction contracts began to be awarded in 2013, and the groundbreaking ceremony for initial construction was held on January 6, 2015.

Kings–Tulare Regional Station is a planned California High-Speed Rail station serving Kings County and Tulare County, California. It will be located near the intersection of Hanford Expressway and Central Valley Highway, just east of the city limits of Hanford and less than 20 miles (32 km) west of the larger city of Visalia. The construction of the station has been controversial, with Tulare County supporting the station while Kings County, where the station would be located, has strongly opposed the entire California High-Speed Rail project.

<span class="mw-page-title-main">Fresno station (California High-Speed Rail)</span>

Fresno is a California High-Speed Rail station being constructed in Fresno, California. The first purpose-built high speed rail station in the United States, it is part of the system's Initial Construction Segment. The facility is located in Downtown Fresno at H Street between Fresno and Tulare Streets, and is being built as an expansion of the adjacent historic Fresno Southern Pacific Depot.

Merced station is a proposed California High-Speed Rail station in Merced, California, located in Downtown Merced. The environmentally approved site is on Martin Luther King Jr. Way near the interchange with Route 99/59, placing it about 7 blocks south from the existing Merced Amtrak station. The station was initially intended to be the northern terminus of the system's Initial Construction Segment. As of April 2022 the California High-Speed Rail Authority is studying an alternative location proposed by the City of Merced and other stakeholders, 8 blocks to the west-northwest along 15th Street, between O Street and R Street. The high-speed rail line will run on the south side of the Union Pacific Railroad right-of-way at these locations.

<span class="mw-page-title-main">Fresno River Viaduct</span>

The Fresno River Viaduct is a bridge to carry California High-Speed Rail over Route 145, the Fresno River, and Raymond Road in Madera County, California.

<span class="mw-page-title-main">Route of California High-Speed Rail</span> Route of the California High-Speed Rail system

The California High-Speed Rail system will be built in two major phases. Phase I, about 520 miles (840 km) long using high-speed rail through the Central Valley, will connect San Francisco to Los Angeles. In Phase 2, the route will be extended in the Central Valley north to Sacramento, and from east through the Inland Empire and then south to San Diego. The total system length will be about 800 miles (1,300 km) long. Phase 2 currently has no timeline for completion.

<span class="mw-page-title-main">Kings River Viaduct</span>

The Kings River Viaduct is a planned series of bridges and embankments carrying California High-Speed Rail over the Kings River in Fresno County and Kings County, California. The site is between the Fresno and Kings–Tulare stations, roughly 4 miles (6.4 km) east of Laton and 8 miles (13 km) north of Hanford. The structure is planned to be over 2 miles (3.2 km) long because three river channels must be crossed, two of which were created by floods in the 1860s.

The Pacheco Pass Tunnels are a planned set of tunnels to carry California High-Speed Rail across the Diablo Range in the vicinity of Pacheco Pass east of Gilroy, California. The tunnels will constitute the first mountain crossing constructed as part of California High-Speed Rail, connecting the San Francisco Bay Area and Central Valley portions of the system.

The Southeast Gateway Line, formerly called the West Santa Ana Branch Transit Corridor, is a planned light rail line, mostly following the Pacific Electric's historic West Santa Ana Branch, connecting Downtown Los Angeles to the city of Artesia, along with other cities in southeastern Los Angeles County.

<span class="mw-page-title-main">Stockton Subdivision</span> Railroad line in California

The Stockton Subdivision is a railroad line in the U.S. state of California owned by the BNSF Railway. It runs from the Port of Richmond, where trains interchange with the Richmond Pacific Railroad, to Fresno where the railway continues south as the Bakersfield Subdivision or the Union Pacific Fresno Subdivision. The line was originally constructed by the San Francisco and San Joaquin Valley Railroad in the late 1890s before being acquired by the Atchison, Topeka and Santa Fe Railway and becoming its Valley Subdivision. BNSF spent $17.5 million to upgrade track, bridges, and crossings along the line in 2005.

Burbank Airport station is a proposed California High-Speed Rail station in Burbank, California, to be located at the Hollywood Burbank Airport adjacent to and just west of that facility's proposed replacement passenger terminal, which will be built in the northeast quadrant of the airfield. The site for the rail station is bounded by Cohasset Street to the north, Winona Avenue on the south, and Hollywood Way along the eastern end of the airport property.

<span class="mw-page-title-main">Impacts of California High-Speed Rail</span> Impacts of the California High-Speed Rail system

In addition to the direct reduction in travel times the HSR project will produce, there are also economic and environmental impacts of the high-speed rail system. These were also specifically noted in Proposition 1A at the time the project sought authorization from the voters of the state in 2008. The anticipated benefits apply both generally to the state overall, as well as to the regions the train will pass through, and to the areas immediately around the train stations.

References

  1. "California High-Speed Train Final Program EIR/EIS: Preferred HST Alignment & Station Locations" (PDF). California High-Speed Rail Authority. August 2005. pp. 16–17. Retrieved November 1, 2015.
  2. "California High-Speed Train Project Final EIR/EIS, Fresno to Bakersfield Section: Alternatives" (PDF). California High-Speed Rail Authority. May 2011. p. 30. Retrieved November 1, 2015.
  3. Douglas, Theo (May 26, 2014). "How the council changed course on bullet train". The Bakersfield Californian. Retrieved November 2, 2015.
  4. 1 2 "Bakersfield F Street Station Alignment (BFSSA) Fact Sheet" (PDF). California High-Speed Rail Authority. Summer 2015. Retrieved October 27, 2015.
  5. 1 2 Cox, John (August 4, 2015). "Alternate high-speed rail route through Bakersfield ready for public inspection". The Bakersfield Californian. Retrieved October 27, 2015.
  6. Weikel, Dan; Vartabedian, Ralph (June 8, 2015). "First phase of bullet train is cut due to Bakersfield, Shafter disputes". Los Angeles Times. Retrieved October 28, 2015.
  7. "California High-Speed Rail Authority Enters into Station Planning Agreement with City of Bakersfield". ABC 23. September 15, 2015. Retrieved October 27, 2015.
  8. Cox, John (February 19, 2016). "Latest high-speed rail shocker: Build the Bakersfield station in Shafter". The Bakersfield Californian. Retrieved February 25, 2016.
  9. Ferguson, Carol (February 22, 2016). "High-speed rail seeking fed money to extend 1st phase to Bakersfield". Bakersfield Now. Retrieved February 25, 2016.
  10. Associated Press (April 21, 2016). "California High-Speed Rail Officials Tinker With Plans". Capital Public Radio. Retrieved April 23, 2016.
  11. Herbets, Adam (April 22, 2016). "People in Bakersfield feel cut out of High-Speed Rail Authority's new plan". Bakersfield Now. KBAK. Retrieved April 23, 2016.
  12. Lindt, John (December 11, 2019). "Kings-Tulare HSR station platform construction to start". The Sun-Gazette Newspaper. Archived from the original on December 12, 2019. Retrieved January 22, 2020.