Built0

The Boeing Human Landing System (HLS) was the name of a proposed lunar lander concept by Boeing that was submitted by Boeing to NASA on 5 November 2019 as part of the Artemis program and the NextSTEP H. The proposal was presented as the "quickest and simplest method" for a 2024 Moon landing. The lunar lander concept was not selected for funding by NASA as part of Artemis in the 30 April 2020 announcement.

Contents

Overview

Boeing Human Landing System was a proposal for the design of a lunar lander and lunar orbit spacecraft that would use the Space Launch System (SLS rocket) being developed by NASA to launch the lander into Earth orbit and then place it in lunar orbit where it would rendezvous with the NASA Lunar Gateway and join up with a crew sent up in an Orion space capsule. [1] This design concept was presented as a response to NASA's solicitation in May 2019, where about a dozen companies proposed lunar lander designs. [2]

The Boeing lander consists of a descent and ascent stage with the descent stage being able to deorbit the lander, which eliminates the need for a third transfer stage. The lander was explicitly designed to be launched on the Boeing-built SLS Block 1B rocket rather than assembled in space after multiple launches, reducing the number of mission-critical events from 11 to 5, and reducing mission complexity. The lander was to be designed such that it would not have to dock onto the Lunar Gateway and could dock with Orion directly in order to allow for a simpler mission profile. The lander was intended to reuse several technologies from Boeing's CST-100 Starliner, so that the pressure vessel, life support and avionics systems could be flight-tested and human-rated before being integrated into the lander. [3]

Intuitive Machines was selected to build and test the lander's engines and fuel tank structure. Aerojet Rocketdyne was also participating in the project. [3]

Challenges

One problem with the lander is its high launch mass which required it to be launched by a SLS Block 1B. This variant of SLS is not expected to be operational until 2025 at the earliest. It was stated that the lander could be launched in parts with the descent stage launching on SLS Block 1 and the ascent stage launching on a commercial launcher and the two parts be assembled in lunar orbit in case Block 1B is not ready. [4]

Investigation

The NASA inspector general launched an investigation after Boeing attempted to change the details of the submission, potentially indicating that Boeing had received information about other bids. [5]

Fate

It was reported by NASASpaceFlight.com in August 2021 that Boeing's VR-3500 engines developed for their lander were being cannibalized by Intuitive Machines for their future Nova-M lander. [6]

See also

Related Research Articles

<span class="mw-page-title-main">Lunar module</span> Lunar lander designed for human spaceflight

A lunar module is a lunar lander designed to allow astronauts to travel between a spacecraft in lunar orbit and the lunar surface. As of 2021, the Apollo Lunar Module is the only lunar module to have ever been used in human spaceflight, completing six lunar landings from 1969 to 1972 during the United States' Apollo program.

<span class="mw-page-title-main">Lunar lander</span> Spacecraft intended to land on the surface of the Moon

A lunar lander or Moon lander is a spacecraft designed to land on the surface of the Moon. As of 2023, the Apollo Lunar Module is the only lunar lander to have ever been used in human spaceflight, completing six lunar landings from 1969 to 1972 during the United States' Apollo Program. Several robotic landers have reached the surface, and some have returned samples to Earth.

<span class="mw-page-title-main">Crew Exploration Vehicle</span> Planned orbiter component of NASAs cancelled Project Constellation; became Orion crew vehicle

The Crew Exploration Vehicle (CEV) was a component of the U.S. NASA Vision for Space Exploration plan. A competition was held to design a spacecraft that could carry humans to the destinations envisioned by the plan. The winning design was the Orion spacecraft.

<span class="mw-page-title-main">Space Launch System</span> NASA super heavy-lift expendable launch vehicle

The Space Launch System (SLS) is an American super heavy-lift expendable launch vehicle used by NASA. As the primary launch vehicle of the Artemis Moon landing program, SLS is designed to launch the crewed Orion spacecraft on a trans-lunar trajectory. The first SLS launch was the uncrewed Artemis 1, which took place on 16 November 2022.

<span class="mw-page-title-main">Artemis 1</span> 2022 uncrewed Moon-orbiting NASA mission

Artemis 1, officially Artemis I and formerly Exploration Mission-1 (EM-1), was an uncrewed Moon-orbiting mission. As the first major spaceflight of NASA's Artemis program, Artemis 1 marked the agency's return to lunar exploration after the conclusion of the Apollo program five decades earlier. It was the first integrated flight test of the Orion spacecraft and Space Launch System (SLS) rocket, and its main objective was to test the Orion spacecraft, especially its heat shield, in preparation for subsequent Artemis missions. These missions seek to reestablish a human presence on the Moon and demonstrate technologies and business approaches needed for future scientific studies, including exploration of Mars.

<span class="mw-page-title-main">Artemis 2</span> Artemis programs second lunar flight

Artemis 2 is a scheduled mission of the NASA-led Artemis program. It will use the second launch of the Space Launch System (SLS) and include the first crewed mission of the Orion spacecraft. The mission is scheduled for no earlier than September 2025. Four astronauts will perform a flyby of the Moon and return to Earth, becoming the first crew to travel beyond low Earth orbit since Apollo 17 in 1972. Artemis 2 will be the first crewed launch from Launch Complex 39B of the Kennedy Space Center since STS-116 in 2006.

<span class="mw-page-title-main">Exploration Upper Stage</span> Rocket stage in NASAs Space Launch System

The Exploration Upper Stage (EUS) is a rocket stage under development that will be used for future flights of NASA's Space Launch System (SLS). Used on SLS Block 1B and Block 2, it will replace the SLS Block 1's Interim Cryogenic Propulsion Stage. The stage will be powered by four RL10C-3 engines burning liquid oxygen and liquid hydrogen to produce a total thrust of 433.1 kN (97,360 lbf). The EUS is expected to first fly on Artemis 4 in 2028.

<span class="mw-page-title-main">Artemis 3</span> Third orbital flight of the Artemis program

Artemis 3 is planned to be the first crewed Moon landing mission of the Artemis program and the first crewed flight of the Starship HLS lander. Artemis 3 is planned to be the second crewed Artemis mission and the first American crewed lunar landing since Apollo 17 in December 1972. In December 2023, the Government Accountability Office reported that the mission is not likely to occur before 2027; as of January 2024, NASA officially expects Artemis 3 to launch no earlier than September 2026.

<span class="mw-page-title-main">Lunar Gateway</span> Lunar orbital space station under development

The Lunar Gateway, or simply Gateway, is a space station which Artemis program participants plan to assemble in an orbit near the Moon. The Gateway is intended to serve as a communication hub, science laboratory, and habitation module for astronauts. It is a multinational collaborative project: participants include NASA, the European Space Agency (ESA), the Japan Aerospace Exploration Agency (JAXA), the Canadian Space Agency (CSA) and the Mohammed Bin Rashid Space Centre (MBRSC). The Gateway is planned to be the first space station beyond low Earth orbit.

<span class="mw-page-title-main">Blue Moon (spacecraft)</span> Lunar lander family developed by Blue Origin for the Artemis program

Blue Moon is a family of lunar landers and their associated infrastructure, intended to carry humans and cargo to the Moon, currently under development by a consortium led by Blue Origin and including Lockheed Martin, Draper, Boeing, Astrobotic, and Honeybee Robotics. Two versions of Blue Moon are under development: a robotic lander planned to land on the Moon in 2024, and a larger human lander planned to land a crew of four astronauts on the lunar surface for the NASA Artemis V mission in 2029.

The Lockheed Martin Lunar Lander is a series of design concepts by Lockheed Martin for a crewed lunar lander.

<span class="mw-page-title-main">Artemis program</span> NASA-led lunar exploration program

The Artemis program is a Moon exploration program that is led by the United States' NASA and was formally established in 2017 via Space Policy Directive 1. The Artemis program is intended to reestablish a human presence on the Moon for the first time since Apollo 17 in 1972. The program's stated long-term goal is to establish a permanent base on the Moon to facilitate human missions to Mars.

<span class="mw-page-title-main">Artemis 4</span> Fourth orbital flight of the Artemis program

Artemis 4 is a planned mission of the NASA-led Artemis program. The mission will include the fourth use of a Space Launch System (SLS) launch vehicle, will send an Orion spacecraft with four astronauts to the Lunar Gateway space station, install a new module on the Gateway, and conduct the second lunar landing of the Artemis program.

<span class="mw-page-title-main">Starship HLS</span> Lunar lander variant of SpaceX Starship

Starship HLS is a lunar lander variant of the Starship spacecraft that is slated to transfer astronauts from a lunar orbit to the surface of the Moon and back. It is being designed and built by SpaceX under the Human Landing System contract to NASA as a critical element of NASA's Artemis program to land a crew on the Moon.

The Integrated Lander Vehicle (ILV) was a human spaceflight lunar lander design concept proposed in 2020/21 for the NASA Human Landing System (HLS) component of the Artemis program. Blue Origin was the lead contractor for the multi-element lunar lander that was to include major components from several large US government space contractors including Lockheed Martin, Northrop Grumman, and Draper Laboratory.

The Dynetics Autonomous Logistics Platform for All-Moon Cargo Access (ALPACA)—also known as Dynetics HLS—(ILV) is a human spaceflight lunar lander design concept proposed in 2020/21 for the NASA Human Landing System (HLS) component of the Artemis program. Dynetics was the lead contractor for the ALPACA lander—other contractors included Sierra Nevada Corporation—for NASA's Artemis Program.

The Human Landing System (HLS) is the spacecraft in NASA's Artemis program that is expected to land humans on the Moon. It is being designed to convey astronauts from the Lunar Gateway space station in lunar orbit to the lunar surface, sustain them there, and then return them to the Gateway station.

References

  1. "Boeing proposes lunar lander for NASA crews, rivaling Blue Origin (and SpaceX?)". news.yahoo.com. Retrieved 2019-11-08.
  2. Potter, Sean (2019-05-16). "NASA Taps 11 American Companies to Advance Human Lunar Landers". NASA. Retrieved 2019-11-08.
  3. 1 2 "Boeing's lunar lander pitch promises 'fastest path' to the moon". Engadget. Retrieved 2019-11-06.
  4. Clark, Stephen. "Boeing proposes SLS-launched lunar lander – Spaceflight Now" . Retrieved 2019-11-11.
  5. Howell, Elizabeth (June 23, 2020). "NASA inspector general looking into Boeing moon lander bid after input from agency official: report". Space.com. Retrieved 10 February 2021.
  6. Neal, Mihir; Kanayama, Lee. "Intuitive Machines adds third mission following first lunar landings in 2022". NASASpaceFlight.com . Retrieved 23 February 2024.