Boston Elevated Railway

Last updated
By 1925, streetcars were gone from most downtown streets. 1925 BERy system map.jpg
By 1925, streetcars were gone from most downtown streets.
Map of the planned West End Street Railway network from 1885. These existing routes were officially merged in 1887. 1885 West End Street Railway map.png
Map of the planned West End Street Railway network from 1885. These existing routes were officially merged in 1887.

The Boston Elevated Railway (BERy) was a streetcar and rapid transit railroad operated on, above, and below, the streets of Boston, Massachusetts and surrounding communities. Founded in 1894, it eventually acquired the West End Street Railway via lease and merger to become the city's primary mass transit provider. Its modern successor is the state-run Massachusetts Bay Transportation Authority (MBTA), which continues to operate in part on infrastructure developed by BERy and its predecessors.

Contents

History

BERy articulated streetcar no. 2 in 1913. The Boston Elevated Railway was the world's first street railway system to use articulated streetcars. BERy Articulated number 2 side view, 1913.jpg
BERy articulated streetcar no. 2 in 1913. The Boston Elevated Railway was the world's first street railway system to use articulated streetcars.
Former MTA PCC car #3295 on display at Boylston PCC 3295.JPG
Former MTA PCC car #3295 on display at Boylston
Retired BERy-era heavy rail subway cars (those closest to camera) at the MBTA Red Line's former Eliot Yard, 1967 Red Line cars at MBTA Eliot Shops in 1967.jpg
Retired BERy-era heavy rail subway cars (those closest to camera) at the MBTA Red Line's former Eliot Yard, 1967
The Central Power Station of the West End Street Railway in the South End, built 1889-91 Central-Power-Station-Boston.jpg
The Central Power Station of the West End Street Railway in the South End, built 1889-91

Originally intended to build a short electric trolley line to Brookline, the West End Street Railway was organized in 1887. By the next year it had consolidated ownership of a number of horse-drawn streetcar lines, composing a fleet of 7,816 horses and 1,480 rail vehicles. As the system grew, a switch to underground pulled-cable propulsion (modeled after the San Francisco cable car system) was contemplated. After visiting Frank Sprague and witnessing the Richmond, Virginia system in action, WESR President Henry Whitney chose to deploy electric propulsion systems. A section of track was used to test the Bentley-Knight underground power line, but this was abandoned because of failures and safety concerns (especially after the electrocution of a team of horses in 1889). After competing in operational tests with the Sprague streetcar system, the Thomson-Houston company was chosen for system-wide deployment of overhead wires. [1] The electrified rapid transit system was named an IEEE Milestone in Electrical Engineering in 2004. [2]

The first electric trolley line built by the West End Street Railway was between Union Square, Allston and Park Square, downtown, via Harvard Street, Beacon Street, Massachusetts Avenue and Boylston Street. Trolleys first ran in 1889. The Green Line A branch later served roughly the same purpose.

The last horse car line was along Marlborough Street in the Back Bay, and was never electrified. It was closed around 1900. [3]

In the late 19th century, the electric power industry was in its infancy; the power grid as we know it today simply did not exist. The railway company constructed its own power stations; by 1897, these included distributed generation stations in downtown Boston, Allston, Cambridge (near Harvard), Dorchester, Charlestown, East Cambridge, and East Boston. By 1904, the system had 36 megawatts of generating capacity, 421 miles (678 km) of track for over 1,550 street cars (mostly closed but some open), and 16 miles (26 km) of elevated track for 174 elevated cars. [1]

On November 7, 1916, Boston Elevated Railway Co. street car No. 393 smashed through the warning gates of the open Summer Street drawbridge in Boston, plunging into the frigid waters of Fort Point Channel, killing 46 people. [4]

The first bus route was in 1922, between Union Square, Allston and Faneuil Street. In 1933 this was merged with the Union Square–Central bus and later became the 64 bus. [5]

Elevated railway

Share of the Boston Elevated Railway Company, issued March 2, 1918 Boston Elevated Railway Company 1918.jpg
Share of the Boston Elevated Railway Company, issued March 2, 1918

In 1890, the West End Railway was authorized by the state to construct elevated railways, but did not pursue this possibility. The state consequently authorized a new franchise for such an endeavor, which resulted in the founding in 1894 in the establishment of the Boston Elevated Railway. The first stretch of elevated track was put in service in 1901, between Sullivan Square in Charlestown and Dudley Square in Roxbury. In 1897, BERy acquired a long-term lease on the West End's lines, and the two companies were formally merged in 1922. The elevated network was expanded to include six end-points, with vehicles run on the tracks in routes designed to allow passengers to reach any destination without changing trains.

Power generation

The difficulty of transporting coal over land from the Port of Boston and the short range of the direct current system prevented significant expansion inland. In 1911, a large generating station was built in South Boston which produced 25 Hertz alternating current, which could be transmitted long distances at high voltage, to substations which would drop the voltage and convert it to direct current for use by trains. The system was gradually converted until completion in 1931, when 14 substations were in place. This station would operate until 1981, when the MBTA had completed converting all of the active substations to be able to use 60 Hertz alternating current, and could switch to purchasing energy from local utility companies instead of running its own generators. [1]

Conversion of routes to trolleybuses and buses

The first route of the Boston trackless trolley system was opened by BERy, on April 11, 1936. It was route 77 (later 69), Harvard – Lechmere via Cambridge Street. Trackless trolleys ran from Harvard station, but only to the west and north, not east to Lechmere after 1963. Trackless trolley service to these routes ended in March of 2022, and they were replaced with temporary diesel buses that are to be replaced with battery electric busses in the spring of 2024. [6]

Operations

The company's rapid transit lines have evolved into the Red, Blue, and Orange Lines. The only streetcars that remain are the various branches of the Green Line and the Ashmont–Mattapan High Speed Line; the rest have been converted to buses.

The Boston Elevated Railway operated in the following cities and towns:

Additionally, streetcars from adjoining towns, run by other companies, operated over Boston Elevated Railway trackage.

Operations of the companies were taken over by the Metropolitan Transit Authority, now the MBTA, in 1947.

Related Research Articles

<span class="mw-page-title-main">Green Line (MBTA)</span> Light rail system

The Green Line is a semi-metro system run by the Massachusetts Bay Transportation Authority (MBTA) in the Boston, Massachusetts, metropolitan area. It is the oldest MBTA subway line, and with tunnel sections dating from 1897, the oldest subway in North America. It runs underground through downtown Boston, and on the surface into inner suburbs via six branches on radial boulevards and grade-separated alignments. With an average daily weekday ridership of 137,700 in 2019, it is the third most heavily used light rail system in the country. The line was assigned the green color in 1967 during a systemwide rebranding because several branches pass through sections of the Emerald Necklace of Boston.

<span class="mw-page-title-main">Harvard station</span> Subway station in Cambridge, Massachusetts, US

Harvard station is a rapid transit and bus transfer station in Cambridge, Massachusetts. Located at Harvard Square, it serves the MBTA's Red Line subway system as well as MBTA buses. Harvard averaged 18,528 entries each weekday in FY2019, making it the third-busiest MBTA station after Downtown Crossing and South Station. Five of the fifteen key MBTA bus routes stop at the station.

<span class="mw-page-title-main">MBTA bus</span> Greater Boston bus network

The Massachusetts Bay Transportation Authority (MBTA) operates 152 bus routes in the Greater Boston area. The MBTA has a policy objective to provide transit service within walking distance for all residents living in areas with population densities greater than 5,000 inhabitants per square mile (1,900/km2) within the MBTA's service district. Much of this service is provided by bus. In 2023, the system had a ridership of 91,459,700, or about 303,300 per weekday as of the fourth quarter of 2023.

<span class="mw-page-title-main">Lechmere station</span> Light rail station in Cambridge, Massachusetts, US

Lechmere station is a Massachusetts Bay Transportation Authority (MBTA) Green Line light rail station in Lechmere Square in East Cambridge, Massachusetts. It is located on the east side of Monsignor O'Brien Highway near First Street, adjacent to the NorthPoint development. The accessible elevated station has a single island platform, with headhouses at both ends. It opened on March 21, 2022, as part of the Green Line Extension (GLX). Lechmere station is served by Green Line D branch and E branch service.

<span class="mw-page-title-main">Hynes Convention Center station</span> Subway station in Boston, Massachusetts, US

Hynes Convention Center station is an underground light rail station on the Massachusetts Bay Transportation Authority (MBTA) Green Line. It is located at the intersection of Newbury Street and Massachusetts Avenue near the western end of the Back Bay neighborhood of Boston, Massachusetts. The station is named for the Hynes Convention Center, which is located about 700 feet (210 m) to the east along Boylston Street. It has two side platforms serving the two tracks of the Boylston Street subway, which are used by the Green Line B branch, C branch, and D branch. The main entrance to the station from Massachusetts Avenue leads to a fare lobby under the 360 Newbury Street building.

<span class="mw-page-title-main">MBTA key bus routes</span> Bus routes utilized and ran by the MBTA

Key bus routes of the Massachusetts Bay Transportation Authority (MBTA) system are 15 routes that have high ridership and higher frequency standards than other bus lines, according to the 2004 MBTA Service Policy. Together, they account for roughly 40% of the MBTA's total bus ridership. These key bus routes ensure basic geographic coverage with frequent service in the densest areas of Boston, and connect to other MBTA services to give access to other areas throughout the region.

The Middlesex and Boston Street Railway (M&B) was a streetcar and later bus company in the area west of Boston. Streetcars last ran in 1930, and in 1972, the company's operations were merged into the Massachusetts Bay Transportation Authority (MBTA).

<span class="mw-page-title-main">Green Line E branch</span> Light rail line

The E branch is a light rail line in Boston, Cambridge, Medford, and Somerville, Massachusetts, operating as part of the Massachusetts Bay Transportation Authority (MBTA) Green Line. The line runs in mixed traffic on South Huntington Avenue and Huntington Avenue between Heath Street and Brigham Circle, in the median of Huntington Avenue to Northeastern University, then into the Huntington Avenue subway. The line merges into the Boylston Street subway just west of Copley, running to North Station via the Tremont Street subway. It then follows the Lechmere Viaduct to Lechmere, then the Medford Branch to Medford/​Tufts. As of February 2023, service operates on eight-minute headways at weekday peak hours and eight to nine-minute headways at other times, using 13 to 17 trains.

<span class="mw-page-title-main">Green Line B branch</span> Light rail line in Boston, Massachusetts

The B branch, also called the Commonwealth Avenue branch or Boston College branch, is a branch of the MBTA Green Line light rail system which operates on Commonwealth Avenue west of downtown Boston, Massachusetts. One of four branches of the Green Line, the B branch runs from Boston College station down the median of Commonwealth Avenue to Blandford Street. There, it enters Blandford Street portal into Kenmore station, where it merges with the C and D branches. The combined services run into the Boylston Street subway and Tremont Street subway to downtown Boston. B branch service has terminated at Government Center since October 2021. Unlike the other branches, the B branch runs solely through the city limits of Boston. The Green Line Rivalry between Boston College and Boston University is named in reference to the B branch, which runs to both universities.

<span class="mw-page-title-main">Green Line A branch</span> Former streetcar line in Massachusetts, US

The A branch or Watertown Line was a streetcar line in the Boston, Massachusetts, area, operating as a branch of the Massachusetts Bay Transportation Authority Green Line. The line ran from Watertown through Newton Corner, Brighton, and Allston to Kenmore Square, then used the Boylston Street subway and Tremont Street subway to reach Park Street station.

<span class="mw-page-title-main">Trolleybuses in Greater Boston</span> Electric powered public transportation

The Boston-area trolleybus system formed part of the public transportation network serving Greater Boston in the U.S. state of Massachusetts. It opened on April 11, 1936, with a large network operating for the next quarter-century. Measured by fleet size, the Boston-area system was the second-largest trolleybus system in the United States at its peak, with only the Chicago system having more trolleybuses than Boston's 463. After 1963, the only remaining portion was a four-route cluster operating from the Harvard bus tunnel at Harvard station, running through Cambridge, Belmont, and Watertown. The Massachusetts Bay Transportation Authority took over the routes in 1964.

<span class="mw-page-title-main">Boston-area streetcar lines</span>

As with many large cities, a large number of Boston-area streetcar lines once existed, and many continued operating into the 1950s. However, only a few now remain, namely the four branches of the Green Line and the Ashmont–Mattapan High-Speed Line, with only one running regular service on an undivided street.

<span class="mw-page-title-main">86 (MBTA bus)</span> Bus route in Greater Boston

Route 86 is a local bus route in Boston, Cambridge, and Somerville, Massachusetts, operated by the Massachusetts Bay Transportation Authority (MBTA) as part of MBTA bus service. It operates on a circumferential route between Sullivan Square station and Reservoir station via Union Square, Somerville, Harvard Square, and Brighton Center. In 2018, it had the 18th-highest weekday ridership on the system, though it ranked 37th by number of weekday trips. A 2018–19 MBTA review of its bus system found that route 86 had infrequent and unreliable service, including irregular scheduled headways, despite its high ridership and significance as a crosstown connecting route.

<span class="mw-page-title-main">Watertown Yard</span> Boston MBTA former subway station

Watertown Carhouse is a bus maintenance facility and former streetcar carhouse located in the southern section of Watertown, Massachusetts, across the Charles River from Watertown Square. As Watertown Yard, the site also serves as a bus depot serving local and express routes, with additional connections available at Watertown Square on the opposite end of the Watertown Bridge.

<span class="mw-page-title-main">History of the MBTA</span> Story of mass transit in the Boston US area

The history of the Massachusetts Bay Transportation Authority (MBTA) and its predecessors spans two centuries, starting with one of the oldest railroads in the United States. Development of mass transportation both followed existing economic and population patterns, and helped shape those patterns.

<span class="mw-page-title-main">Babcock Street station</span> Light rail station in Boston, Massachusetts, US

Babcock Street station is a light rail stop on the Massachusetts Bay Transportation Authority (MBTA) Green Line B branch, located in the median of Commonwealth Avenue in the west part of the Boston University campus. The accessible station has two side platforms serving the line's two tracks, with access at Babcock Street and Pleasant Street.

<span class="mw-page-title-main">Green Line Extension</span> Light rail system in greater Boston, US

The Green Line Extension (GLX) was a construction project to extend the Massachusetts Bay Transportation Authority (MBTA) Green Line light rail system northwest into Somerville and Medford, two inner suburbs of Boston, Massachusetts. The project opened in two phases in 2022 at a total cost of $2.28 billion. Total ridership on the 4.3-mile (6.9 km) extension is estimated to reach 45,000 one-way trips per day in 2030.

<span class="mw-page-title-main">Amory Street station</span> Light rail station in Boston, Massachusetts, US

Amory Street station is a light rail stop on the Massachusetts Bay Transportation Authority (MBTA) Green Line B branch, located in the median of Commonwealth Avenue in the west part of the Boston University campus. The accessible station has two side platforms serving the line's two tracks, with access at Amory Street and St. Paul Street.

<span class="mw-page-title-main">Newton Corner station</span> Transit hub in Newton, Massachusetts, US

Newton Corner is an MBTA bus transfer point in the Newton Corner neighborhood of Newton, Massachusetts, located on the rotary where Washington Street crosses the Massachusetts Turnpike. The Newton Corner station, known simply as Newton for much of its lifetime, served commuters on the Worcester Line from 1834 to 1959. A streetcar stop, located on the surface streets, served a number of routes beginning in 1863, including the Green Line A branch until 1969. Newton Corner is now a stop and transfer point for MBTA routes 52, 57, 501, 504, 553, 554, 556, and 558, which include express routes to downtown Boston as well as local routes, with stops on the north and south sides of the rotary.

<span class="mw-page-title-main">Conductor's Building</span> Former Boston railway administration building

The Conductor's Building is a former Boston Elevated Railway (BERy) administrative building, located on Bennett Alley between Mount Auburn Street and Bennett Street near Harvard Square in Cambridge, Massachusetts. Built in 1912 as the headquarters of BERy's 7th Division, it is the only original building surviving from the construction of the Cambridge subway. After being renovated from 2014 to 2017 as part of an adjacent hotel project, the building was used as a restaurant from April 2017 to August 2018. Under the name Boston Elevated R.Y. Offices, it is a contributing property to the Harvard Square Historic District.

References

  1. 1 2 3 History of electrification of the West End Street Railway Archived October 2, 2006, at the Wayback Machine
  2. "Milestones:Power System of Boston's Rapid Transit, 1889". IEEE Global History Network. IEEE. Retrieved 28 July 2011.
  3. Closure
  4. "Street Car Plunge 46 Drowned". Boston Globe. 29 October 2016. Retrieved 17 November 2016.
  5. bus
  6. "Beginning March 2022, MBTA Routes 71 and 73 Trolley Buses To Be Replaced with Diesel-Hybrid Buses due to Roadway Projects on Mt. Auburn Street, Belmont Street, and Huron Avenue in Cambridge and Watertown | News | MBTA". www.mbta.com. Retrieved 2022-06-02.

Further reading