Reston Town Center station

Last updated

Reston Town Center
WMATA Silver.svg
RestonTownCenter Station Platform04.jpg
Reston Town Center station platform on opening day
General information
Location12023-A Sunset Hills Road
Reston, Virginia
Coordinates 38°57′10″N77°21′37″W / 38.95278°N 77.36028°W / 38.95278; -77.36028
Platforms1 island platform
Tracks2
Connections
Construction
Structure typeAt-grade
Parking2,000 spaces [1]
Bicycle facilities Capital Bikeshare, 40  racks, 22  lockers [1]
AccessibleYes
Other information
Station codeN07
History
OpenedNovember 15, 2022;13 months ago (2022-11-15)
Passengers
2023227,760 [2]
Rank92 out of 98
Services
Preceding station WMATA Metro Logo small.svg Washington Metro Following station
Herndon
toward Ashburn
Silver Line Wiehle–Reston East
Location
Reston Town Center station

Reston Town Center station (preliminary name Reston Parkway) [3] is a rapid transit station on the Silver Line of the Washington Metro in Reston, an unincorporated area in Northern Virginia. It opened on November 15, 2022.

Contents

The station is located in the central section of Reston, within the median of SR 267 (Dulles Toll Road) west of its interchange with SR 602 (Reston Parkway). Reston Town Center is approximately 2,000 ft (610 m) to the north of the station. The station has a single island platform with two tracks. Two pedestrian bridges cross the highway, linking the station to bus bays and kiss and ride lots on either side. [4]

History

The Silver Line was developed in the 21st century to link Washington, D.C., by rail to Washington Dulles International Airport and the edge cities of Tysons, Reston, Herndon, and Ashburn. [5] It was built in two phases; the first phase, linking Washington, D.C., to Wiehle–Reston East, opened in 2014. [6] The funding and planning of Phase 2 through Dulles Airport continued while Phase 1 was being constructed. In 2012, the Loudoun County Board of Supervisors voted 5 to 4 to extend the line to Dulles Airport and into the county. [7] On April 25, 2013, the Phase 2 contract was issued at a cost of $1.177 billion. [8]

The station under construction in 2018. Reston Town Center Station.jpg
The station under construction in 2018.

In April 2015, project officials pushed back the opening date for the station to late 2019, stating that stricter requirements for stormwater management caused much of the delay. Per officials, the line also had to incorporate improvements to the system's automated train controls that were a late addition to the project's first phase. [9] In August 2019, project officials reported that they expected construction on the second phase of the Silver Line to be completed by mid-2020. [10] The opening date was postponed to early 2021, [11] then to late 2021. [12] In February 2021, Metro announced that it would need five months to test the Phase 2 extension. [13] [14] The Metropolitan Washington Airports Authority (MWAA) then announced that the Phase 2 extension should be substantially complete by Labor Day 2021, [15] although MWAA subsequently missed this deadline. [16]

MWAA declared the work on the rail line to be "substantially complete" in November 2021. However, WMATA estimated that it could take five months of testing and other preparations before passenger service could begin. [17] Simulated service testing began operating along the Phase 2 tracks in October 2022. [18] [19] [20] Phase 2 formally opened on November 15, 2022. [21]

Transit-oriented development

As with all stations on the Silver Line within Fairfax County, the Fairfax County Planning Commission aims to transform the surrounding area into a mixed-use, dense, and walkable neighborhood connected to Reston Town Center. The Planning Commission has delineated an area bounded by New Dominion Parkway, Reston Parkway, Sunset Hills Road, Sunrise Valley Drive, and Fairfax County Parkway for transit-oriented development. [22] The vast majority of the precinct is devoted to mixed-use zoning, while some outlying areas are designated for office, industrial, or government use. [22]

Station layout

MMezzanineFare control, ticket machines, station agent
P
Platform level
Westbound WMATA Silver.svg toward Ashburn (Herndon)
Island platform
Eastbound WMATA Silver.svg toward Downtown Largo (Wiehle–Reston East)
GStreet levelExit/entrance, buses

Related Research Articles

<span class="mw-page-title-main">Washington Metro</span> Rapid transit system serving the Washington metropolitan area

The Washington Metro, often abbreviated as the Metro and formally the Metrorail, is a rapid transit system serving the Washington metropolitan area of the United States. It is administered by the Washington Metropolitan Area Transit Authority (WMATA), which also operates the Metrobus service under the Metro name. Opened in 1976, the network now includes six lines, 98 stations, and 129 miles (208 km) of route.

<span class="mw-page-title-main">Blue Line (Washington Metro)</span> Washington Metro rapid transit line

The Blue Line is a rapid transit line of the Washington Metro system, consisting of 28 stations in Fairfax County, Alexandria and Arlington, Virginia; Washington, D.C.; and Prince George's County, Maryland, United States. The Blue Line runs from Franconia–Springfield to Downtown Largo. The line shares track with the Orange Line for 13 stations, the Silver Line for 18, and the Yellow Line for 7. Only 3 stations are exclusive to the Blue Line.

<span class="mw-page-title-main">Orange Line (Washington Metro)</span> Washington Metro rapid transit line

The Orange Line is a rapid transit line of the Washington Metro system, consisting of 26 stations in Fairfax County and Arlington, Virginia; the District of Columbia; and Prince George's County, Maryland, United States. The Orange Line runs from Vienna in Virginia to New Carrollton in Maryland. Half of the line's stations are shared with the Blue Line and over two thirds are shared with the Silver Line. Orange Line service began on November 20, 1978.

<span class="mw-page-title-main">West Falls Church station</span> Washington Metro station

West Falls Church station is a Washington Metro station in Idylwood, Virginia on the Orange Line, the first station inside the Capital Beltway on the Orange Line going east. It is one of only two stations in the system to have three tracks, the other being the National Airport station. The center track is used for storage and relaying trains to the adjacent Falls Church Yard.

<span class="mw-page-title-main">East Falls Church station</span> Washington Metro station

East Falls Church station is an island platformed Washington Metro station in Arlington County, Virginia, on the Orange and Silver Lines. East Falls Church station is the last aboveground, at-grade, or open-cut station for eastbound trains. East of this station, the trains enter tunnels.

<span class="mw-page-title-main">Huntington station (Washington Metro)</span> Washington Metro station

Huntington station is an island-platformed Washington Metro station in the Huntington area of Fairfax County, Virginia, United States. The station was opened on December 17, 1983, and is operated by the Washington Metropolitan Area Transit Authority (WMATA). Serving as the southern terminus for the Yellow Line, the station is built into a hillside; the south mezzanine, along with escalator access, is accessible via an incline elevator.

<span class="mw-page-title-main">Fairfax Connector</span> Public bus service serving Fairfax County, Virginia

Fairfax Connector is a public bus service provided by Fairfax County, Virginia, United States, and is managed by the county government. The bus system provides service within Fairfax County, and connects to Metrobus, Metrorail stations, Virginia Railway Express, and other local bus systems. Fairfax Connector serves all of Fairfax Metrorail Stations, the city of Alexandria, the city of Fairfax, the Washington Dulles International Airport, and the Pentagon Metrorail station. In 2022, the system had a ridership of 4,851,200, or about 31,400 per weekday as of the third quarter of 2023.

<span class="mw-page-title-main">Silver Line (Washington Metro)</span> Rapid transit line

The Silver Line is a rapid transit line of the Washington Metro system, consisting of 34 stations in Loudoun County, Fairfax County and Arlington County, Virginia, Washington, D.C., as well as Prince George's County, Maryland. The Silver Line runs from Ashburn in Virginia to Downtown Largo in Maryland. Five stations, from both lines' eastern terminus at Downtown Largo to Benning Road, are shared with the Blue Line alone; thirteen stations, from Stadium–Armory to Rosslyn, with both the Orange Line and Blue Lines; and five stations from Court House to East Falls Church with the Orange Line alone. Only the five stations of Phase 1, which began service on July 26, 2014, and the six stations of Phase 2, which began service on November 15, 2022, are exclusive to the Silver Line.

<span class="mw-page-title-main">McLean station</span> Washington Metro station

McLean station is a Washington Metro station in Fairfax County, Virginia, on the Silver Line. The station is located in Tysons, with a McLean postal address. It began operation on July 26, 2014.

<span class="mw-page-title-main">Greensboro station (Washington Metro)</span> Washington Metro station

Greensboro station is a Washington Metro station in Tysons, in Fairfax County, Virginia, on the Silver Line. It opened on July 26, 2014, as part of phase 1 of the Silver Line. Greensboro is one of four Metro stations in the Tysons area and is to be part of the massive regeneration of the district.

<span class="mw-page-title-main">Spring Hill station</span> Washington Metro station

Spring Hill station is a Washington Metro station in Fairfax County, Virginia, on the Silver Line. Located in Tysons, it began operation on July 26, 2014. The station is located in the central median of Leesburg Pike just west of Spring Hill Road.

<span class="mw-page-title-main">Wiehle–Reston East station</span> Washington Metro station

Wiehle–Reston East station is a Washington Metro station in Fairfax County, Virginia on the Silver Line. Located in Reston, the station is situated alongside Reston Station, a mixed-use urban center. Upon its opening, Wiehle–Reston East was the western terminus of the Silver Line with a pocket track just beyond the station for reversing trains until November 15, 2022, when service was extended to the new westernmost terminus at Ashburn station.

<span class="mw-page-title-main">Herndon station</span> Washington Metro station

Herndon station is a Washington Metro station in Fairfax County, Virginia on the Silver Line that opened on November 15, 2022. The station is in the median strip of VA-267 adjacent to the current Herndon-Monroe Park and Ride parking garage and bus station, which is on the south side of the highway. It has two pedestrian bridges across SR 267 to reach entrances on either side of the highway. Bus bays are located on the south side of the highway.

<span class="mw-page-title-main">Innovation Center station</span> Washington Metro station

Innovation Center station is a Washington Metro station in Fairfax County, Virginia on the Silver Line. It is located adjacent to the Virginia Center for Innovative Technology at the intersection of the SR 267 and SR 28 in McNair, near the Fairfax / Loudoun county line. Originally planned to begin operation in 2016, the station opened on November 15, 2022.

<span class="mw-page-title-main">Dulles International Airport station</span> Washington Metro station at Dulles Airport

Washington Dulles International Airport station is a Washington Metro station at Dulles International Airport in Loudoun County, Virginia, U.S., on the Silver Line. After years of delays, the station opened on November 15, 2022. The station was originally planned to be underground but was built as an above-ground station next to daily parking garage 1.

<span class="mw-page-title-main">Loudoun Gateway station</span> Washington Metro station

Loudoun Gateway station is a Washington Metro station in Loudoun County, Virginia, on the Silver Line. It is located at SR 606 and the ramps to SR 267. Originally planned to begin operations in 2016, the station opened on November 15, 2022.

<span class="mw-page-title-main">Ashburn station (Washington Metro)</span> Washington Metro station

Ashburn station is a Washington Metro station in Loudoun County, Virginia, United States, that serves as the western terminus of the Silver Line. Originally planned to begin operation in 2016, the station opened on November 15, 2022.

<span class="mw-page-title-main">Metropolitan Washington Airports Authority</span> Airport authority in Washington D.C.

The Metropolitan Washington Airports Authority (MWAA) is an independent airport authority, created with the consent of the United States Congress to oversee management, operations, and capital development of the two major airports serving the U.S. national capital: Ronald Reagan Washington National Airport and Washington Dulles International Airport.

Wolf Trap is a proposed Washington Metro station in Fairfax County, Virginia, on the Silver Line between Wiehle–Reston East and Spring Hill. The station would be located in the central median of Virginia State Route 267 at the Trap Road overpass adjacent to the Wolf Trap National Park for the Performing Arts.

<span class="mw-page-title-main">D.C.–Dulles Line</span>

The D.C.–Dulles Line, designated Route 5A, was a bus route operated by the Washington Metropolitan Area Transit Authority (WMATA) between Washington Dulles International Airport and L'Enfant Plaza station of the Blue, Yellow, Orange, Green and Silver lines of the Washington Metro. The line operated every 30–40 minutes on weekdays and 60 minutes on weekends along the Dulles Toll Road, Interstate 66, Richmond Highway and Interstate 395 between these two locations with no intermediate stops, with the exception of the Herndon–Monroe Park & Ride and Rosslyn station. The trip was approximately 50 minutes long.

References

  1. 1 2 Klavon, Dawn (February 14, 2023). "Everything You Need to Know About the Silver Line Extension". Northern Virginia Magazine. Retrieved July 3, 2023.
  2. "Rail Ridership Data Viewer". WMATA. Retrieved January 8, 2024.
  3. Hosh, Kafia (March 29, 2011). "Fairfax OKs names for new Metrorail stations". Washington Post. Retrieved March 29, 2011.
  4. "Dulles Metrorail – Reston Town Center". Metropolitan Washington Airports Authority. Retrieved August 26, 2013.
  5. "Silver Line Activation Plan" (PDF). WMATA. Archived from the original (PDF) on February 9, 2014. Retrieved June 28, 2014.
  6. III, Ashley Halsey; Aratani, Lori; Duggan, Paul (July 26, 2014). "All aboard! Metro's new Silver Line rolls down the tracks for the first time". Washington Post. ISSN   0190-8286 . Retrieved November 16, 2022.
  7. Jacobson Moore, Erika (July 3, 2012). "Loudoun's In: Split Board Backs Silver Line Extension". Leesburg Today Media Services. Archived from the original on July 8, 2012. Retrieved July 9, 2012.
  8. "Airports Authority Intends to Award Phase 2 Construction Contract to Capital Rail Constructors" (Press release). April 25, 2013. Retrieved March 22, 2014.
  9. Goldberg, The Associated Press, Jeff (April 28, 2015). "Final phase of Silver Line to Dulles delayed until 2019". WJLA. Retrieved December 13, 2020.{{cite web}}: CS1 maint: multiple names: authors list (link)
  10. Roussey/ABC7, Tom (August 6, 2019). "Airports Authority: Silver Line could be completed by April 2020". WJLA. Retrieved December 13, 2020.{{cite web}}: CS1 maint: numeric names: authors list (link)
  11. Roussey (ABC7), Tom (February 20, 2020). "Second phase of Metro Silver Line delayed again, will open spring 2021 at the earliest". WJLA. Retrieved December 13, 2020.{{cite web}}: CS1 maint: numeric names: authors list (link)
  12. "Second phase of Metro's Silver Line now expected to be delayed again, to fall 2021". wjla.com. Retrieved December 13, 2020.
  13. "Silver Line Phase 2 Update" (PDF). WMATA. February 11, 2021. Retrieved September 6, 2021.
  14. Cushman & Wakefield Research (February 3, 2014). "Silver Line". Washington Business Journal. Retrieved September 6, 2021.
  15. "Silver Line extension expected to be ready for Metro takeover by Labor Day". March 5, 2021.
  16. "MWAA will miss Labor Day deadline for Silver Line Phase 2, likely pushing back opening". July 2, 2021.
  17. "Silver Line extension to Dulles inches closer to completion after years of delay". Washington Post. ISSN   0190-8286 . Retrieved November 16, 2022.
  18. "Simulated service for Silver Line Phase Two to begin next month but opening date uncertain". FFXnow. September 8, 2022. Retrieved October 7, 2022.
  19. "Your new Silver Line stations coming soon with a new Metrorail map". www.wmata.com. WMATA. Retrieved October 7, 2022.
  20. "Next Phase of Silver Line to Open Soon". NBC4 Washington. Retrieved October 7, 2022.
  21. "Metro launches Silver Line Extension with opening ceremony; welcomes customers to #RideSilver to six new stations" (Press release). Washington Metropolitan Area Transit Authority. November 15, 2022.
  22. 1 2 "Reston Parkway station area community meeting" (PDF). Fairfax County Planning Commission. Retrieved June 11, 2016.